The Texas Commission on Environmental Quality (TCEQ, agency, or commission) adopts the amendments to §210.54.

Amendment to §210.54 is adopted without changes to the proposed text as published in the May 15, 2026, issue of the Texas Register (51 TexReg 3339) and, therefore, will not be republished.

Background and Summary of the Factual Basis for the Adopted Rules

TCEQ is adopting amendments to 30 Texas Administrative Code (TAC) Chapter 210 (Use of Reclaimed Water), Subchapter E (Special Requirements for Use of Industrial Reclaimed Water) to implement Senate Bill (SB) 1145, 89th Regular Texas Legislative Session, which amended Texas Water Code (TWC), §26.131 (Duties of the Railroad Commission), to transfer permitting authority for the land application of produced water that is treated for beneficial use from the Railroad Commission of Texas (RRC) to TCEQ for permit applications filed on or after September 1, 2025.

TCEQ is adopting amendments to §210.54 to add produced water regulated under 40 Code of Federal Regulations (CFR) Parts 435 and 437 to the list of process wastewater exceptions that may be authorized for reuse under the subchapter.

As part of this rulemaking, the commission is also adopting amendments to 30 TAC Chapter 309 (Domestic Wastewater Effluent Limitations and Plant Siting) concurrently in this issue of the Texas Register.

Section by Section Discussion

Amended §210.54, Wastes Not Eligible for Coverage, revises paragraph (a)(5), regarding exceptions to the wastes ineligible for coverage under Subchapter E that are process wastewater regulated under 40 CFR Parts 400- 471, to add produced water regulated under 40 CFR Part 435 as new subparagraphs (J) within §210.54(a)(5). The amended paragraph also adds produced water regulated under 40 CFR Part 437 in accordance with requirements, conditions, and prohibitions in Part 437, as new subparagraph (L) within §210.54(a)(5). Existing subsequent subparagraphs are renumbered.

TCEQ's jurisdiction at facilities seeking authorization to reuse produced water that has been treated for beneficial use under this subchapter is outlined under §7.117 of this title,

Memorandum of Understanding between the Railroad Commission of Texas (RRC) and the Texas Commission on Environmental Quality (TCEQ).

Final Regulatory Impact Determination

The commission reviewed the rulemaking action in consideration of the regulatory analysis requirements of Texas Government Code (TGC), §2001.0225, and determined that the action is not subject to §2001.0225 because it does not meet the definition of a "Major environmental rule" as defined in that statute. A "Major environmental rule" is defined as a rule, the specific intent of which, is to protect the environment or reduce risks to human health from environmental exposure and that may adversely affect in a material way the economy, a sector of the economy, productivity, competition, jobs, the environment, or the public health and safety of the state or a sector of the state. The proposed rulemaking is not specifically intended to protect the environment or reduce risks to human health from environmental exposure. Rather, it intends to implement SB 1145, which amended TWC, §26.131 and transferred permitting authority from the RRC to the TCEQ of applications filed on or after September 1, 2025, for the land application of produced water that is treated for beneficial use, and to expand the existing requirements under 30 TAC Chapter 210, Subchapter E, to add produced water regulated under 40 CFR Parts 435 and 437 to the list of process wastewater exceptions that may be authorized for reuse under the subchapter.

Even if the proposed rulemaking was a "Major environmental rule," TGC, §2001.0225 still would not apply to this rulemaking because §2001.0225 only applies to a "Major environmental rule," the result of which is to: 1) exceed a standard set by federal law, unless the rule is specifically required by state law; 2) exceed an express requirement of state law, unless the rule is specifically required by federal law; 3) exceed a requirement of a delegation agreement or contract between the state and an agency or representative of the federal government to implement a state and federal program; or 4) adopt a rule solely under the general powers of the agency instead of under a specific state law.

This rulemaking does not meet any of these four applicability criteria because it: 1) does not exceed a standard set by federal law; 2) does not exceed an express requirement of state law; 3) does not exceed a requirement of a delegation agreement or contract between the state and an agency or representative of the federal government to implement a state and federal program; and 4) is not proposed solely under the general powers of the agency, but rather specifically under 40 CFR Parts 435 and 437, which provide effluent limitations and guidelines pursuant to 33 U.S.C. §§1251, 1311, 1316, and 1326 (Federal Water Pollution Control Act); TWC, §26.131, which authorizes the commission to issue permits for the land application of produced water; §26.027, which authorizes the commission to issue permits; and §26.121, which authorizes the commission to prohibit unauthorized discharges. Therefore, this proposed rulemaking does not fall under any of the applicability criteria in TGC, §2001.0225.

The commission invited public comment regarding the draft regulatory impact analysis determination during the public comment period. Healthy Gulf submitted comments regarding the draft regulatory impact analysis.

Takings Impact Assessment

TCEQ evaluated this proposed rule and performed an analysis of whether it constitutes a taking under TGC, Chapter 2007. The proposed rulemaking intends to implement SB 1145, which amended TWC, §26.131 and transferred permitting authority from RRC to TCEQ of applications filed on or after September 1, 2025, for the land application of produced water that is treated for beneficial use, and to add produced water regulated under 40 CFR Parts 435 and 437 to the list of process wastewater exceptions that may be authorized for reuse under the subchapter.

Promulgation and enforcement of the proposed rulemaking would be neither a statutory nor a constitutional taking of private real property. The proposed rule does not affect private property in a manner that restricts or limits an owner's right to the property that would otherwise exist in the absence of a governmental action. Consequently, this rulemaking action does not meet the definition of a taking under TGC, §2007.002(5).

Consistency with the Coastal Management Program

The commission reviewed the adopted rules and found that they are neither identified in Coastal Coordination Act Implementation Rules, 31 TAC §29.11(b)(2) or (4), nor will they affect any action/authorization identified in Coastal Coordination Act Implementation Rules, 31 TAC §29.11(a)(6). Therefore, the adopted rules are not subject to the Texas Coastal Management Program.

The commission invited public comment on the consistency with the CMP during the public comment period. No comments were received regarding the CMP.

Public Comment

TCEQ held a public hearing on June 15, 2026. The comment period closed on June 16, 2026. TCEQ received 617 public comments on the proposal including Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, WildEarth Guardians, Community Advocate, Healthy Gulf, Nature Conservancy, Future Heist, Commission Shift, Earthworks, Clean Water Action/Clean Water Fund, Hill County Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Glenrose Engineering, Truckers Movement for Justice, Circle Verde Water, Hinds Feat, NGL Water Solutions Permian, Texas Oil and Gas Association, Texas Independent Producers Water Association, Texas Alliance of Energy Producers, Earthjustice, Texas Industry Project, and CMV Consulting, and several individuals. Commentors expressed mixed support, requested further changes to the proposed rules, and recommended the commission limit the rulemaking to statutorily required changes.

Response to Comments

Comment

General Opposition

Commission Shift, Earthworks, Greater Edwards Aquifer Alliance, Clean Water Action/Clean Water Fund, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, WildEarth Guardians, Earthjustice, Healthy Gulf, Truckers Movement for Justice, and individuals expressed general opposition to disposal of treated produced water by land application under 30 TAC Chapter 309 and/or Chapter 210. Future Heist requested that the commission reject or withdraw the proposed rules.

Response

The executive director acknowledges these comments.

Comment

WildEarth Guardians and Healthy Gulf requested that TCEQ prohibit the land application of treated produced water.

Response

SB 1145, 89th Regular Legislative Session, amended TWC, Chapter 26, Subchapter D (relating to Prohibition Against Pollution; Enforcement) to amend §26.131 (relating to Duties of the Railroad Commission) to transfer permitting authority for the land application of produced water by irrigation that is treated for beneficial use from the Railroad Commission of Texas (RRC) to TCEQ for permit applications filed on or after September 1, 2025. If this activity were prohibited by TCEQ rules, TCEQ would not be compliant with state statute.

Comment

Clean Water Action/Clean Water Fund, Hinds Feat, Sierra Club, Glenrose Engineering, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf and individuals stated that the proposed rules are inconsistent with statute. Commentors noted that the statute directed TCEQ to adopt standards for land application of treated produced water, or that the statute did not mention industrial waste-streams.

Response

The proposed rules would clarify that 30 TAC Chapter 309 establishes the minimum requirements for disposal of treated produced water through irrigation to ensure the protection of water quality, human health, and the environment. The proposed rules are consistent with the statute and required to implement SB 1145. A future rulemaking may be conducted to adopt additional standards for land application of treated produced water.

In addition to the revisions required to implement SB 1145, proposed amendments to 30 TAC Chapter 309 would clarify applicability regarding the land application of industrial wastewater, which includes treated produced water. The minimum requirements for land application of treated effluent established under Chapter 309 have historically been applied to land application of industrial wastewater on the basis of best professional judgement. This proposed revision would clarify that the rules apply to TCEQ industrial land application permits. The amended chapter would also add a reference to 30 TAC §217.203 (relating to Design Criteria for Natural Treatment Systems) to clarify that the requirements of the section are applicable to the treatment of domestic wastewater as appropriate (see 30 TAC §217.201 relating to Applicability) and correct the title of two figures.

Comment

Clean Water Action/Clean Water Fund, Hinds Feat, Sierra Club, Glenrose Engineering, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf and individuals expressed concern that the proposed rules under Chapter 309 are insufficient or do not provide a sufficient regulatory framework for land application of treated produced water by irrigation. Commentors requested that TCEQ develop a full permitting program that includes public participation requirements (including availability of application materials, public notice requirements, and opportunities for public comment and contested case hearings; enforcement requirements), compliance history requirements, testing requirements, and enforcement requirements.

Response

The proposed rules would be consistent with TCEQ's Texas land application permitting program. The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through land irrigation and are expected to be sufficient to develop permits that will be protective of water quality, human health, and the environment.

Applications submitted to obtain a Texas land application permit (TLAP) under Chapter 26 of the TWC are processed under 30 TAC Chapters 305 (relating to Consolidated Permits) and 281 (relating to Application Processing), and are subject to all applicable TCEQ rules, regulations, and prohibitions, including but not limited to those under 30 TAC Chapters 25 (relating to Environmental Testing Laboratory Accreditation and Certification), 39 (relating to Public Notice), 55 (relating to Requests for Reconsideration and Contest Case Hearing; Public Comment), 60 (relating to Compliance History), 70 (relating to Enforcement), 80 (relating to Contested Case Hearings), 213 (relating to the Edwards Aquifer), 222 (Subsurface Area Drip Dispersal Systems), 327 (relating to Spill Prevention and Control), and 335 (relating to Industrial Solid Waste and Municipal Hazardous Waste).

Comment

An individual questioned the basis of testing and reporting requirements associated with renewing an existing land application permit as related to the protection of water quality and public resources, where water is applied on private property and does not leave the permitted site.

Response

Standard sampling required for the renewal of land application permits often tests for a broader suite of toxic or trace pollutants than routine monthly monitoring. This catches unexpected contaminants in the wastestream. Testing data is used during TCEQ's application review process to verify current effluent characteristics and update limitations in an existing permit.

The testing and reporting requirements contained in the water quality permit application to obtain or renew a land application permit are based on applicable state and federal rules and guidance to ensure protection of water quality, human health, and the environment.

General Support

Comment

Greater Edwards Aquifer Alliance, Circle Verde Water, Hinds Feat, NGL Water Solutions Permian, Texas Oil and Gas Association, Texas Independent Producers Water Association, Texas Alliance of Energy Producers, Earthjustice, Texas Industry Project, CMV Consulting, and individuals expressed general support for the proposed Chapter 309 rulemaking regarding land application of treated produced water. Some individuals also expressed general support for transfer of jurisdiction for the land application of produced water from RRC to TCEQ.

Response

The executive director acknowledges these comments.

Comment

Meta Midstream, Texas Oil and Gas Association, Texas Independent Produced Water Association, and Texas Industry Project expressed general support for the proposed Chapter 210 rulemaking regarding reuse of treated produced water.

Response

The executive director acknowledges these comments.

Concerns related to Water Quality

Comment

Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, and individuals expressed concern that land application of treated produced water by irrigation will impact groundwater and drinking water supplies, including public and private wells.

Response

The legislature has determined that "the goal of groundwater policy in this state is that the existing quality of groundwater not be degraded. This goal of non-degradation does not mean zero-contaminant discharge." Chapter 26 of the TWC further states, "discharges of pollutants, disposal of wastes, or other activities subject to regulation by state agencies be conducted in a manner that will maintain present uses and not impair potential uses of groundwater or pose a public health hazard."

The proposed rules would be consistent with TCEQ's Texas land application permitting program. The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through land irrigation to ensure protection of water quality (including groundwater), human health, and the environment. No discharge of pollutants into water in the state is authorized under an individual TLAP and it is therefore expected to be protective of groundwater. However, additional site-specific provisions may be established on a case-by-case basis to ensure protection of potable water sources and supplies.

Comment

An individual expressed concern that land application of treated produced water will impact wetlands. National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Sierra Club, and Hill County Alliance recommended expanding the existing prohibition of a wastewater treatment plant at 30 TAC §309.13(b) to apply to constructed wetlands.

Response

The TWC defines "water" or "water in the state" to mean groundwater, percolating or otherwise, lakes, bays, ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, wetlands, marshes, inlets, canals, the Gulf of America, inside the territorial limits of the state, and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt, navigable or non-navigable, and including the beds and banks of all watercourses and bodies of surface water, that are wholly or partially inside or bordering the state or inside the jurisdiction of the state.

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent. No discharge of pollutants into water in the state is authorized under an individual TLAP and it is therefore expected to be protective of wetlands. However, additional site-specific provisions may be established in an issued land application permit as necessary to ensure protection of potable water sources and supplies.

Comment

Greater Edwards Aquifer Alliance, Glenrose Engineering, Earthjustice, and Sierra Club expressed concern about potential land application of treated produced water over aquifers, including the Edwards Aquifer. Glenrose Engineering requested the proposed rule be revised to prohibit land application of treated produced water over the Edwards Aquifer Contributing, Recharge, and Transition Zones.

Response

No discharge of pollutants into water in the state is authorized by a TLAP. TCEQ has established rules for regulated activities on the Edwards Aquifer recharge and contributing zones under 30 TAC Chapter 213 (Edwards Aquifer). The proposed rules would be implemented on a case-by-case basis in individual TLAPs.

Concerns regarding Health and the Environment

Comment

Commission Shift, Earthworks, Greater Edwards Aquifer Alliance, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, Truckers Movement for Justice, and individuals expressed concerns about potential impacts to human health and/or public health from irrigation of treated produced water.

Response

As previously stated, Chapter 26 of the TWC requires that discharges of pollutants, disposal of wastes, or other activities subject to regulation by state agencies be conducted in a manner that will not pose a public health hazard.23

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use, to ensure protection of human health and public health. Additional site-specific provisions may be established in an issued land application permit on a case-by-case basis to ensure protection of human health.

Comment

Commission Shift, Earthworks, Greater Edwards Aquifer Alliance, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, Future Heist, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, Truckers Movement for Justice, and individuals expressed concerns about potential impacts to the environment, including wildlife, livestock and farmland, and other critical environmental features or natural resources.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use, to ensure protection of the environment. However, additional site-specific provisions may be established in an issued land application permit on a case-by-case basis, as necessary, to ensure protection of the environment, including wildlife, livestock and farmland, and other critical environmental features or natural resources.

Comment

National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, WildEarth Guardians, Sierra Club, and an individual expressed concerns about potential impacts from spills.

Response

Spills are considered an unauthorized discharge and are subject to 30 TAC Chapter 327 (relating to Spill Prevention and Control). An unauthorized discharge is a violation of the proposed permit for which an enforcement action can be brought by TCEQ against a permittee. However, an issued TLAP would not limit anyone's ability to seek legal remedies from the owner or operator (i.e, permittee) regarding any potential trespass, nuisance, or other cause of action in response to the proposed facility's activities that may result in injury to human health or property or interfere with the normal use and enjoyment of property.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, WildEarth Guardians; Healthy Gulf, and individuals expressed concerns about potential impacts from leaching and runoff.

Response

Potential impacts from leaching would be evaluated during the application review process for a permit to land irrigation with produced water that is treated for beneficial use. Any potential impacts identified during evaluation would be addressed by site-specific permit requirements established in the issued land application permit.

Land application permits authorize the disposal of wastewater by irrigation only. A TLAP does not authorize the discharge of pollutants off site or into waters in the state and prohibits any unauthorized discharges. Leaching into groundwater and runoff are two forms of unauthorized discharge prohibited. An unauthorized discharge is a violation of the proposed permit for which an enforcement action can be brought by TCEQ against a permittee.

Concerns related to the Proposed Rule

Comment

Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, Future Heist, WildEarth Guardians, Earthjustice, Healthy Gulf, and individuals expressed concern that the proposed rules do not establish specific effluent analysis and testing requirements for an application to obtain a permit to land apply treated produced water. Sierra Club, Glenrose Engineering, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, Truckers Movement for Justice, and individuals expressed concerns that treated produced water to be land-applied could contain chemicals such as salts, clays, waxes, metals and heavy metals, per- and polyfluoroalkyl substances (e.g., PFAS), industrial solvents, inorganic and organic compounds, including volatile organic compounds and other dissolved gases, chemical additives and fracking fluids, and other unknown substances. Sierra Club, Glenrose Engineering, Future Heist, Nature Conservancy, Earthjustice, Healthy Gulf, and individuals expressed concern about radioactive materials or naturally occurring radioactive materials in produced water. Commission Shift, Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, WildEarth Guardians, Earthjustice, Healthy Gulf, and individuals commented that the proposed rule should establish specific or minimum effluent limitations and standards for land application of produced water, including toxicity testing.

Response

The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through irrigation.

Analytical requirements for proposed land application activities are established in the water quality permit application for industrial wastewater dischargers and under an issued land application permit based on applicable state and federal rules and guidance. During technical review, TCEQ staff establish appropriate site-specific effluent limitations, irrigation rates, and any special provisions necessary to ensure the protection of water quality, health, and the environment in the land application permit. Irrigation rates established in an issued TLAP are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants, and may include lifetime loading limits for certain pollutants if needed to ensure protection of water quality, health, and the environment. If issued, a permittee would be required to comply with the permit and adhere to the effluent analysis and testing requirements established in the permit, as well as the application rate and effluent limitations.

To clarify that additional site-specific requirements will be developed on a case-by-case basis, proposed 30 TAC §309.20 was revised to include new provision (d), as follows:

"(d) Additional Requirements. Additional site-specific requirements for the treatment and disposal of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that has been treated for beneficial use, may be established on a case-by-case basis."

Comment

Commission Shift, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Healthy Gulf, and individuals expressed concerns about pollutant accumulation from land application activities. Additionally, Healthy Gulf and individuals commented that the rules should require bioaccumulation tracking.

Response

The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through irrigation.

During technical review, TCEQ staff establish appropriate site-specific effluent limitations, irrigation rates, and any special provisions necessary to ensure the protection of water quality, health, and the environment in the land application permit. Irrigation rates established in an issued TLAP are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants, and may include lifetime loading limits for certain pollutants if needed to ensure the permit is protective of water quality, health, and the environment.

Comment

Individuals expressed concerns that produced water is not like wastewater from domestic, agricultural, or other industrial sources. Commentors recommended that TCEQ create separate regulations for produced water. CMV Consulting LLC commented that separate rules should be developed for land application of produced water over the Carrizo aquifer.

Response

TCEQ follows the methodology and procedures outlined under 30 TAC Chapter 309 to evaluate an application to dispose of treated effluent. Based on technical reviews of the application and proposed activities, TCEQ staff develop a permit that establishes effluent limitations and permit requirements that are expected to protect human health and the environment.

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent. A TLAP does not authorize the discharge of pollutants off site or into water in the State.

Additional site-specific provisions may be established in an issued land application permit as necessary to ensure protection of groundwater resources. The rule also provides for regulatory flexibility when establishing requirements under 30 TAC §309.13(c) in a permit by allowing TCEQ to consider exceptions and establish alternative provisions if the alternative provides adequate protection of potable water sources and supplies.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance expressed concern about setback distances 30 TAC §309.13(c)(1) - (6) and commented that larger setback distances are needed to ensure protection of water resources from land irrigation with industrial wastewater, including produced water, as well as Sierra Club, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, Healthy Gulf, Community Advocate and other individuals . Greater Edwards Aquifer Alliance also expressed concern and recommended that the required setbacks be revised to one-acre from water supply wells for land application of produced water. Sierra Club commented that the proposed setback at 30 TAC §309.13(c)(6) should be greater and requested TCEQ provide the technical basis for the proposed distances and demonstrate why they are protective of the environment and public health. The Texas Industry Project expressed concern about the proposed requirement at 30 TAC §309.13(c)(6) and requested removal. The Texas Industry Project noted the provision may cause a broad suite of facilities to be out of compliance with TCEQ rules and it addresses conditions beyond those required to be addressed under SB 1145, and recommend it be removed. Alternatively, The Texas Industry Project suggested that the distance limit should (1) expressly apply only to new units, not units that were authorized or constructed prior to the effective date of the final rule and (2) expressly allow case-by-case exceptions as approved by the Executive Director. Future Heist commented that the proposed requirement at 30 TAC §309.13(c)(6) fails to account for slope. Future Heist and individuals requested the rules establish setbacks for neighborhoods, schools, daycares, and community centers.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use. An individual TLAP does not authorize the discharge of pollutants off site or into water in the state, including groundwater.

Requirements under 30 TAC §309.13(c) would establish distances required to locate a wastewater treatment unit (including an irrigation area) from water features. These requirements are expected to be protective of groundwater, surface water, and public health in the event of an unauthorized discharge or significant rain event that could cause run off from an irrigation area.

The proposed 100-foot setback under 30 TAC §309.13(c)(6) is a standard provision included in issued TLAPs that authorize the disposal of industrial wastewaters through land application. This provision ensures protection of water in the state from land application activities and is consistent with existing buffer zone requirements for land application activities already authorized by the commission under 30 TAC §222.81 relating to Subsurface Area Drip Dispersal Systems (SADDS) and 30 TAC §§321.40(h), 321.48(e)(6), and 321.409(1) relating to CAFOs.

Additional site-specific provisions may be established in an issued land application permit as necessary to ensure protection of groundwater resources. However, the rule also provides for regulatory flexibility when establishing requirements under 30 TAC §309.13(c) in a permit by allowing TCEQ to consider exceptions and establish alternative provisions if the alternative provides adequate protection of potable water sources and supplies.

Comment

Healthy Gulf and individuals expressed concern about accountability. Glenrose Engineering, WildEarth Guardians, and individuals expressed concern about TCEQ's ability to enforce a TLAP for treated produced water. Sierra Club and individuals expressed concern that the proposed rules do not contain enforcement requirements for the land application of treated produced water. Meta Midstream expressed concern about the lack of additional record-keeping requirements in the proposed rule.

Response

A TCEQ-issued permit contains enforceable requirements and provisions to ensure accountability for permit holders in the operation of their facility and land application area(s). A permit holder is required to maintain records and notify the agency if the effluent does not meet the permit conditions according to the requirements established in the permit. In addition, TCEQ regional staff may sample the effluent during routine inspections or in response to a complaint.

A land application permit holder is subject to administrative, civil, and criminal penalties, as applicable, under TWC, §§7.051 - 7.075 (relating to Administrative Penalties), 7.101 - 7.111 (relating to Civil Penalties), and 7.141 - 7.202 (relating to Criminal Offenses and Penalties) for violations including, but not limited to, negligently or knowingly violating the federal Clean Water Act (CWA) §§301, 302, 306, 307, 308, 318, or 405, or any condition or limitation implementing any sections in a permit issued under CWA §402.

Penalties, including the monetary amount of administrative fines, are determined by the TCEQ Enforcement Division and depend on the nature and extent of the violation(s).

Comment

Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, WildEarth Guardians, Community Advocate, Healthy Gulf, and individuals expressed concern about agency oversight for a land application permit for treated produced water. Commentors recommended TCEQ revise the rule to include requirements such as independent testing, additional or continuous monitoring requirements, and livestock monitoring requirements.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use.

All wastewater treatment facilities and land application areas must be operated and maintained consistent with applicable TCEQ rules. An issued permit describes the conditions under which a specific wastewater facility must operate and will include provisions that require the facility and land application site(s) to be properly operated and maintained at all times.

Monitoring requirements established in an issued permit are based on TCEQ guidance documents for establishing monitoring frequencies. The monitoring frequencies in a draft permit can be increased or decreased based on an Applicant's ability to demonstrate compliance with the permitted effluent limitations.

TCEQ's Office of Compliance and Enforcement ensures compliance with applicable state and federal regulations. The appropriate regional office conducts a mandatory comprehensive compliance investigation (CCI) at EPA-classified minor facilities once every five fiscal years. Additional mandatory investigations can be required if the facility is categorized as significant noncompliance (SNC). SNC is determined by the Compliance Monitoring Section of TCEQ and is based on self-reported effluent violations.

Comment

Hinds Feat requested that TCEQ develop an expedited permitting route for land application of produced water.

Response

The executive director is proposing to amend Chapter 210 to include treated produced water as a wastestream eligible for reuse to create an accelerated authorization route for the land application of produced water that is treated for beneficial use. Industrial reclaimed water authorizations issued under Chapter 210 are reviewed and issued following a streamlined approach, typically taking about two months to obtain.

Industrial reuse activities that may be authorized under Chapter 210 are much smaller in scale and must adhere to the criteria, requirements, and prohibitions outlined in the Chapter, thus requiring significantly less technical review and oversight. Industrial reuse applications do not require public notice or offer an opportunity for a contested case hearing, which also reduces the timeframes needed to obtain an authorization.

Comment

The Texas Industry Project and Texas Oil and Gas Association expressed concerns about creating an inconsistency within the rules because the proposed definition of "produced water" at 30 TAC §309.11(9) incorporates by reference the definition at 30 TAC §305.541(b), which specifically mentions discharges into water in the state.

Response

The proposed definition has been revised as follows:

Produced water - is defined for the commission's implementation of Texas Water Code, §26.131(e), all wastewater associated with oil and gas exploration, development, and production activities, except hydrostatic test water and gas plant effluent.

Comment

Sierra Club commented that the proposed rules should include a definition for "treated produced water". The Texas Industry Project requested the addition of a definition for "treated produced water fluids", as follows:

"…for purposes of this Chapter 309, produced water that has been treated for beneficial use and is land applied. For purposes of this Chapter 309, the definition does not include those treated wastewaters that are industrial reclaimed water as defined by 30 TAC 210.52 and regulated under Chapter 210 or that are treated fluid as defined by 16 TAC 4.110 and regulated by the Railroad Commission of Texas."

Response

The executive director declines to include a definition for produced water that is treated for beneficial use and land applied.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance expressed concern about the existing definition of "new facility," which includes only domestic wastewater treatment facilities.

Response

To clarify applicability to both domestic and industrial wastewater treatment facilities, the definition for "New Facility" has been revised to "Any wastewater treatment facility which is not an existing facility."

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance recommended the addition of a definition for the term "domestic raw water supply."

Response

The executive director declines to include a definition for "domestic raw water supply." TCEQ rules and regulations related to raw water supply are located under 30 TAC Chapter 290 (relating to Public Drinking Water). TCEQ defines raw water supply conceptually as untreated surface water entering a domestic water treatment plant.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance recommended the addition of a definition for the term "agricultural practice."

Response

The executive director declines to include a definition for "agricultural practices". Definitions for "agriculture or agricultural" and "agricultural use" are established under TCEQ rules located at 30 TAC Chapter 297 (relating to Water Rights).

Comment

The Sierra Club (Lone Star Chapter) commented that the proposed rules should include a definition for "land application."

Response

The executive director declines to include a definition for "land application." Land application activities that may be authorized under Chapter 309 include the disposal of treated effluent by surface irrigation, drainfields, or subsurface land application, unless otherwise prohibited by state or federal rules or statute.

Comment

NGL Water Solutions Permian, LLC, Texas Oil and Gas Association, Texas Industry Project, National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance expressed concerns about applicability of requirements for treatment and disposal of domestic wastewater to industrial wastewater, including produced water. Texas Oil and Gas Association, NGL Water Solutions Permian, Texas Industry Project, National Wildlife federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance recommended revisions to remove ambiguity and ensure that provisions applicable only to domestic wastewater treatment facilities do not inadvertently apply to land application of industrial wastewater or treated produced water.

Response

The following revisions to the proposed rule text for Chapter 309 have been made to clarify the applicability of requirements that are explicitly for the treatment and disposal of domestic wastewater:

30 TAC §§309.1(b) and (e)and 30 TAC §§309.13(e)- (i) have been revised to clarify applicability of the requirement to treated domestic sewage

30 TAC §309.10(a)(1) has been revised as follows:

(1) This subchapter establishes minimum standards for the location of domestic wastewater treatment facilities and land application of industrial wastewater, including produced water under Tex. Water Code §26.131(e) that is treated for beneficial use. These standards are to be applied in the evaluation of an application for a permit to:

(A) treat and dispose of domestic wastewater;

(B) treat and dispose of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use;

(C) obtain approval of construction plans and specifications for domestic wastewater treatment facilities."

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance commented that proposed rule language at 30 TAC §309.2(b) should be revised from "may" to "must".

Response

The executive director acknowledges this comment; however, no revisions to this subsection were proposed to implement SB 1145 or clarify TCEQ's land application permitting program as it relates to disposal of industrial wastewaters.

Comment

The Texas Industry Project requested TCEQ include a "nondisturbance" provision under 30 TAC §309.10, as follows:

"This chapter does not apply to the management, transport, storage, recycling, or impoundment of produced water or treated produced water fluids prior to being applied to land for irrigation or other beneficial use."

Response

The executive director declines to include a "nondisturbance" provision for oil and gas waste. However, the executive director acknowledges that the proposed rules do not apply to the management, transport, storage, recycling, or impoundment of produced water or treated produced water fluids prior to being applied to land for irrigation or other beneficial use. Jurisdictional boundaries between TCEQ and RRC are established in the Memorandum of Understanding between TCEQ and RRC located at 30 TAC §7.117.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance commented that proposed revisions at 30 TAC §309.20 are inadequate to ensure protection from land irrigation with industrial wastewater, including produced water. The commentors requested that 30 TAC §309.20(a)(4) be revised to require groundwater testing and monitoring to protect groundwater quality resources as well as livestock and wildlife that obtain water from those resources. They also requested revisions of 30 TAC §309.20(b) to expand scope relating to crop irrigation, primary and secondary effluent requirements, design analysis, and soil testing requirements to ensure the requirements apply to and are appropriate to be protective for irrigation with treated produced water.

Response

The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through land irrigation to ensure protection of water quality (including groundwater), human health, and the environment, and would be consistent with TCEQ's Texas land application permitting program. No discharge of pollutants into water in the state is authorized under an individual TLAP and it is therefore expected to be protective of groundwater and potable water resources. Additional site-specific provisions may be established on a case-by-case basis to ensure an issued permit is protective for irrigation with produced water that is treated for beneficial use.

Comment

An individual commented that the proposed rules should require a redemonstration of compliance to obtain a permit to land-apply produced water.

Response

As described, entities seeking to land-apply treated effluent are required to provide analytical data with their application that is representative of the proposed effluent to be land-applied.

Following issuance of a land application permit, the permittee is required to analyze the treated effluent prior to conducting land application activities. The permittee is also required to maintain monthly reports of the results of the effluent analyses and flow measurements for a minimum of three years. A permittee may either collect and analyze the effluent samples themselves, or it may contract with a third party for either or both the sampling and analysis. However, all samples must be collected and analyzed according to 30 TAC Chapter 319, Subchapter A. The permittee is required to further notify the agency if the effluent does not meet the permit limits according to the requirements in the permit. In addition, TCEQ regional staff may sample the effluent during routine inspections or in response to a complaint.

Based on staff review, TCEQ may establish additional site-specific monitoring requirements as necessary to assure protection of water quality, human health, and the environment.

Comment

Future Heist, WildEarth Guardians, and individuals commented that TCEQ should require financial assurance to obtain a permit to land-apply treated produced water.

Response

TCEQ develops rules and requirements for financial assurance when authority to do so is provided by State or Federal law. Inclusion of financial assurance requirements goes beyond the authority provided under TWC, §26.131.

However, an issued TLAP would not limit anyone's ability to seek legal remedies from the owner or operator (i.e., permittee) regarding any potential trespass, nuisance, or other cause of action in response to the proposed facility's activities that may result in injury to human health or property or interfere with the normal use and enjoyment of property.

Comment

Glenrose Engineering commented 30 TAC §213.3(28)(B)(iii), which exempts activities associated with the exploration, development, and production of oil, gas, or geothermal resources under the jurisdiction of RRC should be amended to clarify that land application of produced water associated with the exploration, development, and production of oil, gas, or geothermal resources for either disposal or beneficial use is a regulated activity under 30 TAC §213.

Response

The executive director acknowledges this comment. Any revisions needed to Chapter 213 would be conducted under a separate rulemaking.

Comment

Glenrose Engineering expressed concern that the proposed rules, under 30 TAC Chapter 210 are inadequate for treated produced water, including the lack of additional effluent limitations, monitoring requirements and frequencies, or setbacks, and recommended the proposed rule be revised to include continuous effluent monitoring requirements, soil and groundwater monitoring on a quarterly basis. Glenrose Engineering also expressed concerns about the allowable reuse activities and irrigation practices under the proposed rules, including the type of authorization required (Level I versus Level II authorization).

Response

Chapter 210, Subchapter E, establishes requirements for industrial reclaimed water which may be used instead of potable or raw water sources for purposes such as landscape irrigation, dust suppression, and impoundment maintenance. This proposed rulemaking would amend Chapter 210 to establish the minimum requirements for the reuse of produced water that is treated for beneficial use.

A Level I authorization for industrial reclaimed water, including treated produced water, provides coverage for on-site reuse without notification to, or written approval from, TCEQ. Eligible wastestreams listed under 30 TAC §210.53(a) may be used in accordance with end uses listed under 30 TAC §210.56(b)(2) and must not contain measured effluent concentrations above the thresholds listed in Table 30 TAC §210.53(a)(9) or above the minimum analytical level for all other priority pollutants in 40 Code of Federal Regulations (CFR), Part 122 Appendix D, Tables II and III.

A Level II authorization for industrial reclaimed water, including treated produced water, provides coverage for on- or off-site reuse after notification is made and written approval is received from TCEQ.

While the proposed revisions to Chapter 210 would establish the minimum requirements for reuse of produced water that is treated for beneficial reuse, additional site-specific effluent limitations and provisions may be established in an issued industrial reuse authorization to ensure protection of water quality, human health, and the environment. If issued, the permittee would be required to comply with the effluent limitations, monitoring frequencies, and reporting requirements established in the industrial reuse authorization.

However, the executive director may also require a land application permit for the proposed reuse activity depending on the proposed volume of treated effluent to be reused, technical complexity of the proposed reuse activity, or quality of the treated effluent to use reused, including produced water that is treated for beneficial use.

Comment

Sierra Club commented that the proposed rule does not include discharge standards specifically designed for treated produced water.

Response

A land application permit for disposal of treated effluent (including produced water treated for beneficial use) does not authorize the discharge of pollutants off-site or into water in the State.

Concerns related to the Rulemaking Process

Comment

Commission Shift, Earthworks, Clean Water Action/Clean Water Fund, Sierra Club, Greater Edwards Aquifer Alliance, Future Heist, Healthy Gulf, and individuals expressed concerns about the public notice and requested an extension of the public comment period.

Response

Consistent with the requirements of 30 TAC Chapter 39, notice of the rulemaking as well as the public hearing on the proposed rule, and proposed rule text were published in the Texas Register on May 15, 2026. A hybrid in-person and virtual public hearing was held at TCEQ on June 15, 2026. The public comment period began on the date of publication and ran until the close of the business on the following day, June 16, 2026. The executive director declines to extend the public comment period on this rulemaking.

Comment

The Sierra Club and individuals commented that any standards developed for the land application of treated produced water should receive notice and opportunity for public input.

Response

Any subsequent rulemakings that the executive director may undertake to adopt additional standards for the land application of treated produced water will comply with TCEQ rules under 30 TAC Chapter 39 (relating to Public Notice) and all applicable public participation requirements to ensure opportunity for public input.

Comment

Future Heist expressed concerns about transparency in the rulemaking process.

Response

Updates regarding this rulemaking have been provided at the executive director's quarterly Water Quality Advisory Work Group meetings. The executive director's staff also have been available throughout the rulemaking process for questions. Filings related to the proposed rulemaking, including the notice, proposed rule text, and descriptions and basis for the proposed changes were available through the Commissioners' Integrated Database for early review by the general public on April 10, 2026, and linked to the Commissioners' Meeting Agenda available on TCEQ's website. Notice of the rulemaking, as well as the public hearing on the proposed rule, and proposed rule text were published in the Texas Register on May 15, 2026. A hybrid in-person and virtual public hearing was held at TCEQ on June 15, 2026. The public comment period began on the date of publication and ran until the close of the business on the following day, June 16, 2026.

Comment

Commission Shift, Earthworks, Clean Water Action/Clean Water Fund, Sierra Club, Future Heist, Community Advocate, Healthy Gulf, and individuals expressed concern about the single public hearing offered on this rulemaking and requested additional in-person and virtual public meetings or hearings on this rulemaking in impacted communities, including rural communities, across the Permian Basin, the Eagle Ford Shale, and the East Texas Basin.

Response

A hybrid in-person and virtual public hearing was held at TCEQ on June 15, 2026. Ten people attended in person and 75 external participants attended virtually. The executive director's staff have been available throughout the rulemaking process. The executive director declines to hold additional public meetings or hearings on this rulemaking.

Comment

The Texas Industry Project suggested TCEQ consider gathering additional stakeholder input to define features that would not be considered "water in the state" for purposes of this rule (e.g., exempt ditches, etc.).

Response

The executive director acknowledges this comment.

Comment

Healthy Gulf expressed concerns about TCEQ Public Costs and Benefits analysis and recommended that TCEQ revise its analysis to acknowledge the potential costs of contaminated groundwater, soil degradation, and public health harm associated with land application of produced water.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with Texas Government Code (TGC), 2001.024. TLAPs authorize the disposal of wastewater by irrigation, only. A TLAP does not authorize the discharge of pollutants off site or into waters in the state and prohibit any unauthorized discharges. As previously discussed, an issued TLAP will contain site-specific application rates to ensure effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants. TCEQ also develops and includes special provisions in a TLAP to prevent surface and groundwater contamination and runoff. The site-specific effluent limits and additional permit requirements that are established in an issued land application permit are expected to assure protection of water quality, human health, and the environment.

As such, TCEQ staff determined that the public benefit will be rule language that provides clarity and establishes minimum requirements regarding how TCEQ would issue permits for the land application of industrial wastewater, including produced water for beneficial use as authorized by SB 1145. The determination also concluded that the public will benefit from the clarity of promulgated requirements related to the location of wastewater treatment plant units or effluent used for irrigation in relation to waters of the state (30 TAC §309.13(d)(2)), as well as from other various clarifications in the rule. The addition of the requirements proposed in the rule would lead to increased protection of water quality in the waters of the state and the land application of produced water may lead to the increased availability of water for beneficial reuse.

Comment

Healthy Gulf expressed concerns about TCEQ's "Major Environmental Rule" analysis. Healthy Gulf commented rulemaking implicates the economy, agricultural productivity, public health, and the environment in ways that plainly meet the threshold for major environmental rule status.

Response

The executive director acknowledges this comment. No change was made in response to this comment. TCEQ staff reviewed the proposed rule amendments in a manner consistent with TGC, 2001.0225.

A "Major environmental rule" is defined as a rule, the specific intent of which, is to protect the environment or reduce risks to human health from environmental exposure and that may adversely affect in a material way the economy, a sector of the economy, productivity, competition, jobs, the environment, or the public health and safety of the state or a sector of the state.

The proposed rulemaking is not specifically intended to protect the environment or reduce risks to human health from environmental exposure. Rather, it intends to implement SB 1145, which amended TWC, §26.131 and transferred permitting authority from RRC to TCEQ of applications filed on or after September 1, 2025, for the land application of produced water that is treated for beneficial use, and to clarify applicability to the land application of industrial wastewater, including produced water under TWC, §26.131 and establish minimum requirements for land application of produced water.

This rulemaking would not: 1) exceed a standard set by federal law; 2) exceed an express requirement of state law; 3) exceed a requirement of a delegation agreement or contract between the state and an agency or representative of the federal government to implement a state and federal program; or 4) adopt a rule solely under the general powers of the agency instead of under a specific state law. Specifically, TWC, §26.131 authorizes the commission to issue permits for the land application of produced water; §26.027, which authorizes the commission to issue permits; and §26.121, which authorizes the commission to prohibit unauthorized discharges. Therefore, this proposed rulemaking does not fall under any of the applicability criteria in TGC, §2001.0225.

Comment

Healthy Gulf expressed concerns about TCEQ's analysis of potential impacts on rural communities and recommended that TCEQ prepare and publicly share a full Rural Communities Impact Assessment, establish specific science-based setback distances and contaminant standards that account for the disproportionate rural exposure, and ensure that rural communities have meaningful access to permit information and the ability to participate in permitting decisions before this rule is finalized.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with TGC, §2006.002.

The proposed amendments would apply statewide and have the same effect in rural communities as in urban communities. They are consistent with TCEQ's Texas land application permitting program and establish the minimum requirements for disposal of treated produced water through land application. As previously discussed, TCEQ reviews proposed land application activities and establishes site-specific effluent limits and additional permit requirements in an issued land application permit as necessary to ensure the protection of water quality, human health, and the environment. Additionally, as previously stated, TLAPs are subject to TCEQ's public participation rules under 30 TAC Chapters 39, 55, and 80, which will provide ample opportunity for interested persons to participate in permitting decisions.

Comment

Individuals expressed concerns about impacts to the state and local economy. Additionally, Healthy Gulf expressed concerns about TCEQ's analysis of potential impacts on the state economy and local economies and recommended that TCEQ conduct and publicly share a full Local Employment Impact Statement focused specifically on agricultural communities in areas where land application permits are most likely to be sought, with sufficient time for public review before the rule is finalized.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with applicable provisions of the TGC, including §§2001.022 and 2001.024.

Entities seeking to land apply treated produced water who were previously able to obtain a permit from RRC would now be required to obtain a land application permit or TLAP from TCEQ. A landowner must provide authorization to land apply treated effluent, including treated produced water, to their land. Additionally, as previously stated, TLAPs are subject to TCEQ's public participation rules under 30 TAC Chapters 39, 55, and 80. These requirements are not expected to adversely affect the state or local economies in a material way.

Comment

Future Heist expressed concerns about inconsistencies in the Growth and Government Impact Statement.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with TGC, §2001.0221.

TCEQ already has the ability to issue land application permits for disposal of treated effluent (including treated produced water) under Chapter 309. Entities seeking to land apply treated produced water who were previously able to obtain a permit from RRC are now required to obtain a land application permit or TLAP from TCEQ; further, TCEQ already has a land application permitting program established. This rulemaking clarifyies the applicability of that permitting program and not expanding it.

TCEQ staff prepared an accurate Government Growth Impact Statement which determined that the proposed rulemaking does not create or eliminate a government program and will not require an increase or decrease in future legislative appropriations to the agency; does not require the creation of new employee positions, eliminating current employee positions, nor require an increase or decrease in fees paid to the agency; amends an existing regulation, but does not create, expand, repeal, or limit the regulation; and does not increase or decrease the number of individuals subject to its applicability. Therefore, TCEQ staff concluded that the proposed rule should not impact positively or negatively the state's economy.

Comment

Individuals commented that additional studies should be required prior to the proposing rules for land application of treated produced water.

Response

The executive director is reviewing existing effluent data available from RRC and pilot programs conducted under their jurisdiction, as well as application materials from applicants seeking a land application permit under TWC, Chapter 26 to determine if additional parameters will be added to the pollutant analysis suite requested in the water quality permit application for land application of treated produced water. A future rulemaking may be conducted to add performance-based effluent limitations or additional permit requirements for treated produced water, as appropriate to ensure the protection of water quality, human health, and the environment.

Comment

Sierra Club requested TCEQ to consider pausing this rulemaking to create an informal draft and stakeholder group.

Response

The executive director acknowledges this comment.

Concerns related to the Permitting Process

Comment

Individuals commented that permit recipients must have good compliance histories.

Response

During the technical review of an application, TCEQ reviews the Applicant's compliance history according to the rules in 30 TAC Chapter 60.

Comment

Sierra Club commented that the proposed rule's reliance on case-by-case permit evaluations and professional judgement raises transparency and consistency concerns. Sierra Club, Greater Edwards Aquifer Alliance, Future Heist, Nature Conservancy, WildEarth Guardians, Community Advocate, Healthy Gulf, and individuals expressed concerns about transparency in the land application permitting process for produced water that is treated for beneficial use.

Response

This proposed rulemaking would establish the minimum requirements for land irrigation with produced water that is treated for beneficial use. Additional, site-specific requirements beyond the requirements of Chapter 309 may be established in an issued permit as neccesary to ensure protection of water quality, human health, and the environment.

As previously stated, the proposed rules would be consistent with TCEQ's land application permitting program. Applications submitted to obtain a TLAP under TWC, Chapter 26 are subject to all applicable TCEQ rules, regulations, and prohibitions, including but not limited to those under 30 TAC Chapters 39 (relating to Public Notice), 55 (relating to Requests for Reconsideration and Contest Case Hearing; Public Comment), and 80 (relating to Contested Case Hearings).

TCEQ rules provide opportunities for transparency during the process to obtain a land application permit.

Specifically, there are two public notices regarding this permit action, the Notice of Receipt of Application and Intent to Obtain a Wastewater Permit (NORI) and the Notice of Application and Preliminary Decision (NAPD). TCEQ's notice rules require applicants to provide public notices for wastewater permits by publishing the NORI in a "newspaper of largest circulation in the county in which the facility is located or proposed to be located … if the facility is located or proposed to be located in a municipality, the applicant publish notice in any newspaper of general circulation in the municipality." After the Office of the Chief Clerk has mailed the preliminary decision and the NAPD to the applicant, they are required to publish the NAPD "at least once in a newspaper regularly published or circulated within each county where the proposed facility or discharge is located and in each county affected by the discharge."

TCEQ's notice rules for a new permit or major amendment require mailed notice of the NORI and NAPD to landowners named on the application map and persons on the mailing list maintained by the Office of the Chief Clerk. An applicant is required to submit a landowner map as part of the application materials. The landowner map must include the property boundaries of landowners surrounding the applicant's property and the property boundaries of all landowners surrounding the discharge point and on both sides of the discharge route for one full stream mile downstream of the discharge point. Additionally, any persons who submit a comment or contested case hearing request prior to the end of the public comment period are added to the mailing list for that permit action.

An applicant must place a physical copy of all application materials in a public viewing location (described in both public notices). In addition, TCEQ must make an exact electronic copy of all applications materials available online for applications submitted on or after June 1, 2024.

Comment

Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, WildEarth Guardians, Community Advocate, Healthy Gulf, and individuals expressed concern about agency oversight for a land application permit for treated produced water. Commentors recommended TCEQ revise the rule to include requirements such as independent testing, additional or continuous monitoring, and livestock monitoring requirements.

Response

All wastewater treatment facilities and land application areas must be operated and maintained consistent with applicable TCEQ rules. An issued permit describes the conditions under which a specific wastewater facility must operate and will include provisions that require the facility and land application site(s) to be properly operated and maintained at all times.

Additionally, monitoring requirements established in the proposed permit are based on TCEQ guidance documents for establishing monitoring frequencies and are typically set at the most stringent allowable for applicants that do not demonstrate a significant potential to exceed the permitted limitations. The monitoring frequencies in a draft permit can be increased or decreased based on an Applicant's ability to demonstrate compliance with the permitted effluent limitations.

TCEQ's Office of Compliance and Enforcement ensures compliance with applicable state and federal regulations. The appropriate regional office conducts a mandatory comprehensive compliance investigation (CCI) at EPA-classified minor facilities once every five fiscal years. Additional mandatory investigations can be required if the facility is categorized as significant noncompliance (SNC). SNC is determined by the Compliance Monitoring Section of TCEQ and is based on self-reported effluent violations.

Concerns Outside of TCEQ Jurisdiction

Comment

WildEarth Guardians commented that the proposed rules should address flood risks.

Response

TLAPs authorize the disposal of wastewater by irrigation, only. A TLAP does not authorize the discharge of pollutants off-site or into waters in the state and prohibits any unauthorized discharges.

TCEQ does not have jurisdiction to address flooding or erosion issues in the wastewater permitting process. The permitting process for land application of wastewater is limited to prohibiting the discharge of pollutants into water in the state. Irrigation rates established in a TLAP are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, or ponding. Additionally, TLAPs prohibit irrigation during a significant rainfall event. If issued, the permittee would be required to comply with the limitations, requirements, and prohibitions established in their permit and would not be expected to contribute to flooding or erosion.

For flooding concerns, please contact the local floodplain administrator for this area. If you need help finding the local floodplain administrator, please call TCEQ Resource Protection Team at (512) 239-4691.

Comment

An individual commented that they should have the right to sue.

Response

Issuance of a Texas Land Application permit for treated produced water does not limit the ability of an individual to seek legal remedies against an applicant regarding any potential trespass, nuisance, or other causes of action in response to activities that may result in injury to human health or property, or that may interfere with the normal use and enjoyment of property. For concerns, please contact local law enforcement or County Sheriff's Office to inquire if there are ordinances in your area.

Comment

An individual expressed concerns about potential impacts to property.

Response

TWC, §26.027 makes clear that TCEQ may issue permits for disposal and dispersal of wastewater adjacent to water in the State through the executive director's evaluation of TLAP applications using the information provided in an application and recommending issuance or denial based on the application's compliance with the TWC and TCEQ rules.

However, an issued land application permit would not limit anyone's ability to seek legal remedies from the permit holder regarding any potential trespass, nuisance, or other cause of action in response to the permitted activities that may result in injury to property or interfere with the normal use and enjoyment of property.

Comment

Hinds Feat commented about potential mineral recovery from produced water and oil and gas exploration activities.

Response

Mineral recovery cannot be addressed in the review of water quality application, as the scope of the executive director's jurisdiction in a land application permit is limited to the issues set out by statute. The land application rules do not prohibit the recovery of minerals from produced water.

Comment

Individuals commented on other potential uses for treated produced water, including for data centers. An individual also commented about alternative disposal options for treated produced water.

Response

TCEQ does not have the authority to mandate the method of disposal of treated effluent or use of alternative disposal options if the applicant adheres to the rules and provisions under TWC, Chapter 26 and 30 TAC Chapters 305, 307, and 309. The proposed rules would not limit potential uses for produced water that is treated for beneficial use.

Comment

Clean Water Action/Clean Water Fund, WildEarth Guardians, Future Heist, and Truckers Movement for Justice questioned how biosolids and byproducts from treatment of produced water would be addressed in a TCEQ permit to land irrigate with produced water.

Response

Any wastewater, biosolids, or other wastes generated during the treatment of produced water are considered oil and gas wastes. Management and disposal authority for oil and gas waste remains under the jurisdiction of RRC.

Comment

The Texas Oil and Gas Association questioned if this proposed rulemaking would alter spill reporting obligations to RRC, except when an unauthorized discharge of wastewater into or adjacent to water in the state would be reported to TCEQ as an element of the TPDES or TLAP permit requirements.

Response

No, this proposed rulemaking is not expected to alter spill reporting obligations to the RRC. However, TCEQ permittees would be required to report unauthorized discharges under the TCEQ-issued permit requirements.

Comment

The Texas Oil and Gas Association expressed concerns about potential impacts to surface impoundments under the proposed rules.

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, and an individual expressed concern about the potential public and wildlife exposure to stored treated produced water.

Response

The revised statute transferred jurisdiction over disposal of produced water that is treated for beneficial reuse by land application. Jurisdiction over the management, including treatment and storage, and disposal of produced water via evaporation in surface impoundments remains under RRC.

Concerns Beyond Scope of Rulemaking

Comment

Greater Edwards Aquifer Alliance expressed concerns about the lack of pretreatment requirements in the proposed rules for land application of treated produced water.

Response

Federal regulations related to pretreatment requirements are located under 40 CFR Part 403 and are applicable to entities that discharge to a publicly-owned treatment work (POTW). These rules do not apply to the disposal of treated produced water by land application.

Comment

Greater Edwards Aquifer Alliance and Future Heist expressed concerns about the lack of remediation requirements in the proposed rules for land application of treated produced water.

Response

TCEQ rules related to remediation requirements are located under 30 TAC Chapter 350, Texas Risk Reduction Program, and are outside of the scope of a water quality permit to land apply treated produced water.

Comment

Future Heist and WildEarth Guardians expressed concerns about the lack of restoration requirements or cleanup standards in the proposed rules for land application of treated produced water.

Response

TCEQ develops rules and requirements to specifically require restoration requirements or cleanup standards when authority to do so is provided by State or Federal law. Inclusion of restoration requirements goes beyond the requirements of the statute under TWC, §26.131.

As previously described, TCEQ establishes site-specific effluent limits and additional permit requirements in the draft permit that are necessary to assure protection of groundwater quality, human health, and the environment. TCEQ establishes irrigation rates in an issued TLAP that are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants, as well as any special provisions needed to prevent surface and groundwater contamination and runoff. If issued, the permittee would be required to comply with the effluent limitations and requirements established in the permit.

Spills and runoff are considered unauthorized discharges. An unauthorized discharge is a violation of the proposed permit for which an enforcement action can be brought by TCEQ against a permittee, subject to cleanup standards under 30 TAC Chapter 327 (relating to Spill Prevention and Control).

However, an issued TLAP would not limit anyone's ability to seek legal remedies from the owner or operator (i.e., permittee) regarding any potential trespass, nuisance, or other cause of action in response to the proposed facility's activities that may result in injury to human health or property or interfere with the normal use and enjoyment of property.

Comment

An individual recommended TCEQ develop a freshwater discharge permit for treated produced water.

Response

The executive director acknowledges this comment.

Comment

Individuals expressed general concerns about TCEQ issuing permits for data centers.

Response

The executive director acknowledges this comment.

Comment

Earthjustice commented that TCEQ must ensure the final rule does not exacerbate ongoing issues with underground injection control wells.

Response

TCEQ rules related to underground injection control well requirements are located under 30 TAC Chapter 331 (Underground Injection Control) and are outside of the scope of a water quality permit to land apply treated produced water.

Comment

Glenrose Engineering commented that the rulemaking should be expanded to prohibit the use of subsurface drip disposal for any reclaimed water, including produced water, with total dissolved solids higher than 5,000 mg/L.

Response

The executive director acknowledges this comment. Any revisions needed to Chapter 222 would be conducted under a separate rulemaking.

Comment

Earthjustice requested that the commission adopt methodology and incorporate into rule as a defined process to implement "best professional judgement."

Response

The executive director acknowledges this comment.

Comment

Earthjustice requested that the commission deny all pending applications seeking to dispose of treated produced water by land application.

Response

The executive director acknowledges this comment.

Miscellaneous comments

Comment

An individual requested TCEQ pause these actions to allow more time to research alternatives and evaluate impacts. Individuals requested that TCEQ slow down or go slowly to develop the proposed rules to implement the statute.

Response

The executive director acknowledges these comments.

Comment

An individual asked where land application of produced water would occur.

Response

Land application of produced water that is treated for beneficial use may occur statewide.

Comment

Clean Water Action/Clean Water Fund, Nature Conservancy and individuals expressed concerns about available treatment methods and treatment requirements for produced water.

Response

TCEQ-issued permits establish performance-based requirements that are outcome-focused instead of prescribing specific treatment methods or technology requirements.

Applicants seeking to dispose of treated produced water through land application must describe the treatment methods that will be used to treat effluent in their wastewater permit application. Provisions included in an issued permit require a permittee to notify TCEQ if any information provided in their application changes, such as proposed treatment technologies or methods to comply with the limits and provisions in the permit. TCEQ staff will determine if any additional information or permit actions are needed to accommodate additional or alternative treatment options and methods.

Comment

Grant Hensarling expressed concern about the potential volume of treated produced water that could be land applied.

Response

TCEQ requires applicants to design their proposed irrigation rates according to the land application site's soil and crop requirements and water balance calculations. The irrigation rates are site-specific and are based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, and ponding. Also, land application permits require monitoring of the volume applied and analysis of the irrigation effluent at a minimum of once per year. Permits also require the permittee to annually submit the laboratory results from these analyses to the TCEQ Water Quality Assessment Team (MC 150), the appropriate TCEQ Region Office, and the Enforcement Division (MC 224) of TCEQ by the end of September of each monitoring year.

Comment

An individual commented that this rulemaking prioritizes the oil and gas industry's waste disposal convenience over the safety of Texas citizens, soil, and ecosystems. Future Heist and individuals expressed concern that the proposed rulemaking places corporate and financial interest over public interest.

Response

TCEQ's mission is to protect the state's public health and natural resources while supporting sustainable economic growth and development. The agency's goals are focused on clean water, clean air, and safe waste management. Permitting decisions are grounded in law, sound science, common sense, and fiscal responsibility, and TCEQ strives to ensure meaningful public participation throughout the decision-making process. The CWA and TWC, which provide the statutory authority for TCEQ rules and regulations related to the protection of water quality, promote voluntary compliance and operational flexibility in achieving environmental goals.

Comment

WildEarth Guardians expressed concerns about the applicability of the oil and gas exploration and production exemption under RCRA.

Response

The oil and gas exploration and production exemption under the Resource Conservation and Recovery Act (RCRA) excludes certain wastes generated by oil, gas, and geothermal operations from federal hazardous waste regulations under RCRA Subtitle C (see 40 CFR 261.4(b)(5)). However, the exemption does not apply to the disposal of produced water that is treated for beneficial use, which is subject to state-level water quality rules.

As previously stated, this rulemaking would clarify that Chapter 309 establishes the minimum requirements for disposal of produced water that is treated for beneficial use through irrigation to ensure the protection of water quality, human health, and the environment. Any biosolids or other wastes generated during the treatment of produced water are considered oil and gas wastes. Management and disposal authority for oil and gas waste remains under the jurisdiction of RRC.

Comment

Future Heist and WildEarth Guardians expressed concerns about the lack of waste-management requirements under the proposed rules.

Response

Oil and gas wastes, including those generated during the treatment of produced water, are regulated under the jurisdiction of RRC. TCEQ rules for managing industrial solid and hazardous wastes are located under 30 TAC Chapter 335. TCEQ-issued permits for disposal of treated wastewater, including treated produced water, through land application do not authorize the disposal of any solid or hazardous wastes, or absolve an entity from adhering to all applicable state and federal rules and requirements.

Comment

WildEarth Guardians and Earthjustice expressed concern that a TCEQ-issued land application permit could insulate permittees, treatment companies, transporters, landowners, or other responsible parties from otherwise applicable federal or state legal obligations. Future Heist expressed concern that H.B. 49 made compliance with a TCEQ permit a liability shield: a company that puts this treated waste to beneficial use under its permit generally cannot be sued in court by the people it harms, except for gross negligence, an intentional act, or a failure to follow its permit (Tex. Nat. Res. Code §122.003, added by H.B. 49, 2025).

Response

The executive director acknowledges this comment. No changes were made in response to it. As previously stated, TCEQ-issued permits for disposal of treated wastewater, including treated produced water, through land application do not authorize the disposal of any solid or hazardous wastes, or absolve an entity (including permittees and upstream or downstream services or disposal activities) from adhering to all applicable state and federal rules and requirements.

Comment

Earthjustice commented that land application permits for produced water should contain site-specific limits based on soil type, depth to groundwater, proximity to wells and surface water, flood risk, crop type, grazing use, wildlife exposure, and cumulative contaminant loading.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use, to ensure protection of human health and public health. Additional site-specific provisions may be established in an issued land application permit on a case-by-case basis to ensure protection of human health and public health.

Comment

Earthjustice questioned if this rulemaking violated the federal prohibition on discharge of produced water west of the 98th meridian.

Response

The federal prohibition located at 40 CFR §435.32 applies to the discharge of produced water or treated produced water into waters of the United States. As previously stated, an issued TLAP does not authorize the discharge of produced water or treated produced water into water in the state.

Changes to the proposed rules:

1. Proposed §309.11(6) has been revised to the following (emphasis added):

"New facility - Any wastewater treatment facility which is not an existing facility."

2. Proposed §309.11(9) has been revised to the following (emphasis added):

"Produced water- is defined for the commission's implementation of Texas Water Code, §26.131(e), all wastewater associated with oil and gas exploration, development, and production activities, except hydrostatic test water and gas plant effluent."

3. Proposed §§309.1(b) and (e) and §§309.13(e)- (i) have been revised to clarify applicability of the requirement to treated domestic sewage.

4. Proposed §309.10(a)(1) has been revised as follows:

(1) This subchapter establishes minimum standards for the location of domestic wastewater treatment facilities and land application of industrial wastewater, including produced water under Tex. Water Code §26.131(e) that is treated for beneficial use. These standards are to be applied in the evaluation of an application for a permit to:

(A) treat and dispose of domestic wastewater;

(B) treat and dispose of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use;

(C) obtain approval of construction plans and specifications for domestic wastewater treatment facilities.

5. Proposed 309.20 has been revised to include new provision (d), as follows:

"(d) Additional Requirements. Additional site-specific requirements for the treatment and disposal of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use, may be established on a case-by-case basis."

Statutory Authority

These amendments to 30 Texas Administrative Code Chapter 210 are adopted under the Texas Water Code (TWC). Specifically, TWC, §5.013, which establishes the general jurisdiction of the commission while TWC, §5.102, provides the commission with the authority to carry out its duties and general powers under its jurisdictional authority as provided by TWC, §5.103; TWC, §5.103, which requires the commission to adopt any rule necessary to carry out its powers and duties under the code and other laws of the state; TWC, §5.105, which authorizes the commission to adopt rules and policies necessary to carry out its responsibilities and duties under the TWC; and TWC, §5.120, which requires the commission to administer the law for the maximum conservation and protection of the environment and natural resources of the state. These amendments are also adopted under TWC, §26.027, which authorizes the commission to issue permits for the discharge of waste or pollutants into or adjacent to water in the state; TWC, §26.121, which provides the commission's authority to prohibit unauthorized discharges into or adjacent to water in the state; and TWC, §26.131, which provides the commission's authority to issue permits for the discharge of produced water into water in the state and for the land application of produced water.

The adopted amendments implement TWC, §§5.013, 5.102, 5.103, 5.105, 5.120, 26.027, 26.121, and 26.131.

The agency certifies that legal counsel has reviewed the adoption and found it to be a valid exercise of the agency's legal authority.

Filed with the Office of the Secretary of State on November 6, 2026.

TRD-202604699

Amy L. Browning

Deputy Director, Environmental Law Division

Texas Commission on Environmental Quality

Effective date: November 26, 2026

Proposal publication date: May 15, 2026

For further information, please call: (512) 239-2678


CHAPTER 309. WASTEWATER EFFLUENT LIMITATIONS AND PLANT SITING

The Texas Commission on Environmental Quality (TCEQ, agency, or commission) adopts amendments to §§309.1, 309.10, 309.11, 309.13, and 309.20.

Amendments to §§309.1, 309.10, 309.11, 309.13, and 309.20 are adopted with changes to the proposed text as published in the May 15, 2026, issue of the Texas Register (51 TexReg 3342) and, therefore, will be republished.

Background and Summary of the Factual Basis for the Adopted Rules

TCEQ is adopting amendments to 30 Texas Administrative Code (TAC) Chapter 309 (Domestic Wastewater Effluent Limitations and Plant Siting) to implement Senate Bill (SB) 1145, 89th Regular Legislative Session, which amended Texas Water Code (TWC), §26.131 (Duties of the Railroad Commission), to transfer permitting authority for the land application of produced water that is treated for beneficial use from the Railroad Commission of Texas (RRC) to TCEQ for permit applications filed on or after September 1, 2025.

TCEQ is adopting amendments to §§309.1, 309.10, 309.11, 309.13, and 309.20 to clarify applicability to the land application of industrial wastewater, including produced water under TWC, §26.131 and establish minimum requirements for land application of produced water that is treated for beneficial use.

As part of this rulemaking, the commission is also adopting amendments to 30 TAC Chapter 210 (Use of Reclaimed Water) concurrently in this issue of the Texas Register.

Section by Section Discussion

The adopted rules amend the title of the chapter to "Wastewater Effluent Limitations and Plant Siting" by removing the word "Domestic" to clarify that this chapter applies to both domestic wastewater and industrial wastewater.

The adopted rules also amend the title of the Subchapter C and §309.20 to "Land Application of Treated Effluent" by removing the word "Sewage" to similarly clarify that this chapter applies to both domestic wastewater and industrial wastewater.

Amended §309.1, Scope and Applicability, revises subsection (a) to clarify that applicability to treated effluent (i.e., domestic wastewater and industrial wastewater) by removing the reference to only ‘domestic sewage'. The amended section clarifies applicability of subsections (b) and (e) to treated domestic sewage. The amended section also corrects the title of Figure: 30 TAC §309.1(b).

Amended §309.10, Purpose, Scope, and Applicability, clarifies applicability to both domestic wastewater and industrial wastewater, including produced water. Subsection (a) would be restructured into paragraphs (1) and (2) and amended, as follows:

Amended subsection (a)(1) clarifies that Subchapter B (relating to Location Standards) applies to land application of industrial wastewater, including produced water under TWC, §26.131(e) that is treated for beneficial use, in addition to domestic wastewater treatment facilities. The amended paragraph also restructures existing provisions related to evaluation of an application as subsection (a)(1)(A) related to domestic wastewater and subsection (a)(1)(C) related to plans and specifications. New subsection (a)(1)(B) clarifies applicability to the evaluation of an application to treat and dispose of industrial wastewater, including produced water under TWC, §26.131(e) that is treated for beneficial use.

Amended subsection (a)(2) expands applicability to include land application permit applications in addition to domestic wastewater permit applications.

Amended §309.11, Definitions, adds a reference to the definition for "Industrial Wastewater" (as defined in 30 TAC §210.52). The amended section also adds a definition for "Produced water" (is defined for the commission's implementation of Tex. Water Code §26.131(e), as all wastewater associated with oil and gas exploration, development, and production activities, except hydrostatic test water and gas plant effluent). The amended section revises the definition for "New facility" by removing the word "domestic" to clarify applicability to domestic and industrial wastewater facilities. Subsequent definitions are renumbered.

Amended §309.13, Unsuitable Site Characteristics, clarifies applicability as well as establish minimum requirements for treatment and disposal of treated effluent.

Amended subsection (c) clarifies applicability to industrial wastewater, including produced water under TWC, §26.131. Amended subsection (c) also adds new paragraph (6) requiring a wastewater treatment plant unit, or land where irrigation using wastewater effluent occurs, to be located a minimum horizontal distance of 100 feet from a water in the state.

Amended subsection (d) clarifies that additional requirements under 30 TAC §217.203 of this title (relating to Design Criteria for Natural Treatment Systems) may apply.

Amended §309.20, Land Application of Treated Effluent, corrects the title of Figure: 30 TAC §309.20(b)(3)(C). The amended section also adds new subsection (d) to establish that additional site-specific requirements for the treatment and disposal of industrial wastewater, including disposal of produced water under TWC, §26.131(e) that is treated for beneficial use, may be established on a case-by-case basis.

TCEQ's jurisdiction at facilities seeking authorization to land apply produced water that is treated for beneficial use under this chapter is outlined under §7.117 of this title,

Memorandum of Understanding between the Railroad Commission of Texas (RRC) and the Texas Commission on Environmental Quality (TCEQ).

Final Regulatory Impact Determination

The commission reviewed the rulemaking action in consideration of the regulatory analysis requirements of Texas Government Code (TGC), §2001.0225, and determined that the action is not subject to §2001.0225 because it does not meet the definition of a "Major environmental rule" as defined in §2001.0225(g)(3). A "Major environmental rule" is defined as a rule, the specific intent of which, is to protect the environment or reduce risks to human health from environmental exposure and that may adversely affect in a material way the economy, a sector of the economy, productivity, competition, jobs, the environment, or the public health and safety of the state or a sector of the state. The proposed rulemaking is not specifically intended to protect the environment or reduce risks to human health from environmental exposure. Rather, it intends to implement SB 1145, which amended TWC, §26.131 and transferred permitting authority from RRC to TCEQ of applications filed on or after September 1, 2025, for the land application of produced water that is treated for beneficial use, and to clarify applicability to the land application of industrial wastewater, including produced water under TWC, §26.131 and establish minimum requirements for land application of produced water.

Even if the proposed rulemaking was a "Major environmental rule," TGC, §2001.0225 still would not apply to this rulemaking because §2001.0225 only applies to a "Major environmental rule," the result of which is to: 1) exceed a standard set by federal law, unless the rule is specifically required by state law; 2) exceed an express requirement of state law, unless the rule is specifically required by federal law; 3) exceed a requirement of a delegation agreement or contract between the state and an agency or representative of the federal government to implement a state and federal program; or 4) adopt a rule solely under the general powers of the agency instead of under a specific state law.

This rulemaking does not meet any of these four applicability criteria because it: 1) does not exceed a standard set by federal law; 2) does not exceed an express requirement of state law; 3) does not exceed a requirement of a delegation agreement or contract between the state and an agency or representative of the federal government to implement a state and federal program; and 4) is not proposed solely under the general powers of the agency, but rather specifically under TWC, §26.131, which authorizes the commission to issue permits for the land application of produced water; §26.027, which authorizes the commission to issue permits; and §26.121, which authorizes the commission to prohibit unauthorized discharges. Therefore, this proposed rulemaking does not fall under any of the applicability criteria in TGC, §2001.0225.

The commission invited public comment regarding the draft regulatory impact analysis determination during the public comment period. Healthy Gulf submitted comments regarding the draft regulatory impact analysis.

Takings Impact Assessment

TCEQ evaluated this proposed rule and performed an analysis of whether it constitutes a taking under TGC, Chapter 2007. The proposed rulemaking intends to implement SB 1145, which amended TWC, §26.131 and transferred permitting authority from RRC to TCEQ for the land application of produced water that is treated for beneficial use, and to clarify applicability to the land application of industrial wastewater, including produced water under TWC, §26.131 and establish minimum requirements for land application of produced water.

Promulgation and enforcement of the proposed rulemaking would be neither a statutory nor a constitutional taking of private real property. The proposed rule does not affect private property in a manner that restricts or limits an owner's right to the property that would otherwise exist in the absence of a governmental action. Consequently, this rulemaking action does not meet the definition of a taking under TGC, §2007.002(5).

Consistency with the Coastal Management Program

The commission reviewed the adopted rules and found that they are neither identified in Coastal Coordination Act Implementation Rules, 31 TAC §29.11(b)(2) or (4), nor will they affect any action/authorization identified in Coastal Coordination Act Implementation Rules, 31 TAC §29.11(a)(6). Therefore, the adopted rules are not subject to the Texas Coastal Management Program.

The commission invited public comment on the consistency with the CMP during the public comment period. No comments were received regarding the CMP.

Public Comment

TCEQ held a public hearing on June 15, 2026. The comment period closed on June 16, 2026. TCEQ received 617 public comments on the proposal including Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, WildEarth Guardians, Community Advocate, Healthy Gulf, Nature Conservancy, Future Heist, Commission Shift, Earthworks, Clean Water Action/Clean Water Fund, Hill County Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Glenrose Engineering, Truckers Movement for Justice, Circle Verde Water, Hinds Feat, NGL Water Solutions Permian, Texas Oil and Gas Association, Texas Independent Producers Water Association, Texas Alliance of Energy Producers, Earthjustice, Texas Industry Project, and CMV Consulting, and several individuals. Commentors expressed mixed support, requested further changes to the proposed rules, and recommended the commission limit the rulemaking to statutorily required changes.

Comment

General Opposition

Commission Shift, Earthworks, Greater Edwards Aquifer Alliance, Clean Water Action/Clean Water Fund, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, WildEarth Guardians, Earthjustice, Healthy Gulf, Truckers Movement for Justice, and individuals expressed general opposition to disposal of treated produced water by land application under 30 TAC Chapter 309 and/or Chapter 210. Future Heist requested that the commission reject or withdraw the proposed rules.

Response

The executive director acknowledges these comments.

Comment

WildEarth Guardians and Healthy Gulf requested that TCEQ prohibit the land application of treated produced water.

Response

SB 1145, 89th Regular Legislative Session, amended TWC, Chapter 26, Subchapter D (relating to Prohibition Against Pollution; Enforcement) to amend §26.131 (relating to Duties of the Railroad Commission) to transfer permitting authority for the land application of produced water by irrigation that is treated for beneficial use from the Railroad Commission of Texas (RRC) to TCEQ for permit applications filed on or after September 1, 2025. If this activity were prohibited by TCEQ rules, TCEQ would not be compliant with state statute.

Comment

Clean Water Action/Clean Water Fund, Hinds Feat, Sierra Club, Glenrose Engineering, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf and individuals stated that the proposed rules are inconsistent with statute. Commentors noted that the statute directed TCEQ to adopt standards for land application of treated produced water, or that the statute did not mention industrial waste-streams.

Response

The proposed rules would clarify that 30 TAC Chapter 309 establishes the minimum requirements for disposal of treated produced water through irrigation to ensure the protection of water quality, human health, and the environment. The proposed rules are consistent with the statute and required to implement SB 1145. A future rulemaking may be conducted to adopt additional standards for land application of treated produced water.

In addition to the revisions required to implement SB 1145, proposed amendments to 30 TAC Chapter 309 would clarify applicability regarding the land application of industrial wastewater, which includes treated produced water. The minimum requirements for land application of treated effluent established under Chapter 309 have historically been applied to land application of industrial wastewater on the basis of best professional judgement. This proposed revision would clarify that the rules apply to TCEQ industrial land application permits. The amended chapter would also add a reference to 30 TAC §217.203 (relating to Design Criteria for Natural Treatment Systems) to clarify that the requirements of the section are applicable to the treatment of domestic wastewater as appropriate (see 30 TAC §217.201 relating to Applicability) and correct the title of two figures.

Comment

Clean Water Action/Clean Water Fund, Hinds Feat, Sierra Club, Glenrose Engineering, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf and individuals expressed concern that the proposed rules under Chapter 309 are insufficient or do not provide a sufficient regulatory framework for land application of treated produced water by irrigation. Commentors requested that TCEQ develop a full permitting program that includes public participation requirements (including availability of application materials, public notice requirements, and opportunities for public comment and contested case hearings; enforcement requirements), compliance history requirements, testing requirements, and enforcement requirements.

Response

The proposed rules would be consistent with TCEQ's Texas land application permitting program. The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through land irrigation and are expected to be sufficient to develop permits that will be protective of water quality, human health, and the environment.

Applications submitted to obtain a Texas land application permit (TLAP) under Chapter 26 of the TWC are processed under 30 TAC Chapters 305 (relating to Consolidated Permits) and 281 (relating to Application Processing), and are subject to all applicable TCEQ rules, regulations, and prohibitions, including but not limited to those under 30 TAC Chapters 25 (relating to Environmental Testing Laboratory Accreditation and Certification), 39 (relating to Public Notice), 55 (relating to Requests for Reconsideration and Contest Case Hearing; Public Comment), 60 (relating to Compliance History), 70 (relating to Enforcement), 80 (relating to Contested Case Hearings), 213 (relating to the Edwards Aquifer), 222 (Subsurface Area Drip Dispersal Systems), 327 (relating to Spill Prevention and Control), and 335 (relating to Industrial Solid Waste and Municipal Hazardous Waste).

Comment

An individual questioned the basis of testing and reporting requirements associated with renewing an existing land application permit as related to the protection of water quality and public resources, where water is applied on private property and does not leave the permitted site.

Response

Standard sampling required for the renewal of land application permits often tests for a broader suite of toxic or trace pollutants than routine monthly monitoring. This catches unexpected contaminants in the wastestream. Testing data is used during TCEQ's application review process to verify current effluent characteristics and update limitations in an existing permit.

The testing and reporting requirements contained in the water quality permit application to obtain or renew a land application permit are based on applicable state and federal rules and guidance to ensure protection of water quality, human health, and the environment.

General Support

Comment

Greater Edwards Aquifer Alliance, Circle Verde Water, Hinds Feat, NGL Water Solutions Permian, Texas Oil and Gas Association, Texas Independent Producers Water Association, Texas Alliance of Energy Producers, Earthjustice, Texas Industry Project, CMV Consulting, and individuals expressed general support for the proposed Chapter 309 rulemaking regarding land application of treated produced water. Some individuals also expressed general support for transfer of jurisdiction for the land application of produced water from RRC to TCEQ.

Response

The executive director acknowledges these comments.

Comment

Meta Midstream, Texas Oil and Gas Association, Texas Independent Produced Water Association, and Texas Industry Project expressed general support for the proposed Chapter 210 rulemaking regarding reuse of treated produced water.

Response

The executive director acknowledges these comments.

Concerns related to Water Quality

Comment

Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, and individuals expressed concern that land application of treated produced water by irrigation will impact groundwater and drinking water supplies, including public and private wells.

Response

The legislature has determined that "the goal of groundwater policy in this state is that the existing quality of groundwater not be degraded. This goal of non-degradation does not mean zero-contaminant discharge." Chapter 26 of the TWC further states, "discharges of pollutants, disposal of wastes, or other activities subject to regulation by state agencies be conducted in a manner that will maintain present uses and not impair potential uses of groundwater or pose a public health hazard."

The proposed rules would be consistent with TCEQ's Texas land application permitting program. The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through land irrigation to ensure protection of water quality (including groundwater), human health, and the environment. No discharge of pollutants into water in the state is authorized under an individual TLAP and it is therefore expected to be protective of groundwater. However, additional site-specific provisions may be established on a case-by-case basis to ensure protection of potable water sources and supplies.

Comment

An individual expressed concern that land application of treated produced water will impact wetlands. National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Sierra Club, and Hill County Alliance recommended expanding the existing prohibition of a wastewater treatment plant at 30 TAC §309.13(b) to apply to constructed wetlands.

Response

The TWC defines "water" or "water in the state" to mean groundwater, percolating or otherwise, lakes, bays, ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, wetlands, marshes, inlets, canals, the Gulf of America, inside the territorial limits of the state, and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt, navigable or non-navigable, and including the beds and banks of all watercourses and bodies of surface water, that are wholly or partially inside or bordering the state or inside the jurisdiction of the state.

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent. No discharge of pollutants into water in the state is authorized under an individual TLAP and it is therefore expected to be protective of wetlands. However, additional site-specific provisions may be established in an issued land application permit as necessary to ensure protection of potable water sources and supplies.

Comment

Greater Edwards Aquifer Alliance, Glenrose Engineering, Earthjustice, and Sierra Club expressed concern about potential land application of treated produced water over aquifers, including the Edwards Aquifer. Glenrose Engineering requested the proposed rule be revised to prohibit land application of treated produced water over the Edwards Aquifer Contributing, Recharge, and Transition Zones.

Response

No discharge of pollutants into water in the state is authorized by a TLAP. TCEQ has established rules for regulated activities on the Edwards Aquifer recharge and contributing zones under 30 TAC Chapter 213 (Edwards Aquifer). The proposed rules would be implemented on a case-by-case basis in individual TLAPs.

Concerns regarding Health and the Environment

Comment

Commission Shift, Earthworks, Greater Edwards Aquifer Alliance, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, Truckers Movement for Justice, and individuals expressed concerns about potential impacts to human health and/or public health from irrigation of treated produced water.

Response

As previously stated, Chapter 26 of the TWC requires that discharges of pollutants, disposal of wastes, or other activities subject to regulation by state agencies be conducted in a manner that will not pose a public health hazard.23

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use, to ensure protection of human health and public health. Additional site-specific provisions may be established in an issued land application permit on a case-by-case basis to ensure protection of human health.

Comment

Commission Shift, Earthworks, Greater Edwards Aquifer Alliance, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, Future Heist, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, Truckers Movement for Justice, and individuals expressed concerns about potential impacts to the environment, including wildlife, livestock and farmland, and other critical environmental features or natural resources.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use, to ensure protection of the environment. However, additional site-specific provisions may be established in an issued land application permit on a case-by-case basis, as necessary, to ensure protection of the environment, including wildlife, livestock and farmland, and other critical environmental features or natural resources.

Comment

National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, WildEarth Guardians, Sierra Club, and an individual expressed concerns about potential impacts from spills.

Response

Spills are considered an unauthorized discharge and are subject to 30 TAC Chapter 327 (relating to Spill Prevention and Control). An unauthorized discharge is a violation of the proposed permit for which an enforcement action can be brought by TCEQ against a permittee. However, an issued TLAP would not limit anyone's ability to seek legal remedies from the owner or operator (i.e, permittee) regarding any potential trespass, nuisance, or other cause of action in response to the proposed facility's activities that may result in injury to human health or property or interfere with the normal use and enjoyment of property.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, WildEarth Guardians; Healthy Gulf, and individuals expressed concerns about potential impacts from leaching and runoff.

Response

Potential impacts from leaching would be evaluated during the application review process for a permit to land irrigation with produced water that is treated for beneficial use. Any potential impacts identified during evaluation would be addressed by site-specific permit requirements established in the issued land application permit.

Land application permits authorize the disposal of wastewater by irrigation only. A TLAP does not authorize the discharge of pollutants off site or into waters in the state and prohibits any unauthorized discharges. Leaching into groundwater and runoff are two forms of unauthorized discharge prohibited. An unauthorized discharge is a violation of the proposed permit for which an enforcement action can be brought by TCEQ against a permittee.

Concerns related to the Proposed Rule

Comment

Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, Future Heist, WildEarth Guardians, Earthjustice, Healthy Gulf, and individuals expressed concern that the proposed rules do not establish specific effluent analysis and testing requirements for an application to obtain a permit to land apply treated produced water. Sierra Club, Glenrose Engineering, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, WildEarth Guardians, Earthjustice, Community Advocate, Healthy Gulf, Truckers Movement for Justice, and individuals expressed concerns that treated produced water to be land-applied could contain chemicals such as salts, clays, waxes, metals and heavy metals, per- and polyfluoroalkyl substances (e.g., PFAS), industrial solvents, inorganic and organic compounds, including volatile organic compounds and other dissolved gases, chemical additives and fracking fluids, and other unknown substances. Sierra Club, Glenrose Engineering, Future Heist, Nature Conservancy, Earthjustice, Healthy Gulf, and individuals expressed concern about radioactive materials or naturally occurring radioactive materials in produced water. Commission Shift, Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, WildEarth Guardians, Earthjustice, Healthy Gulf, and individuals commented that the proposed rule should establish specific or minimum effluent limitations and standards for land application of produced water, including toxicity testing.

Response

The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through irrigation.

Analytical requirements for proposed land application activities are established in the water quality permit application for industrial wastewater dischargers and under an issued land application permit based on applicable state and federal rules and guidance. During technical review, TCEQ staff establish appropriate site-specific effluent limitations, irrigation rates, and any special provisions necessary to ensure the protection of water quality, health, and the environment in the land application permit. Irrigation rates established in an issued TLAP are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants, and may include lifetime loading limits for certain pollutants if needed to ensure protection of water quality, health, and the environment. If issued, a permittee would be required to comply with the permit and adhere to the effluent analysis and testing requirements established in the permit, as well as the application rate and effluent limitations.

To clarify that additional site-specific requirements will be developed on a case-by-case basis, proposed 30 TAC §309.20 was revised to include new provision (d), as follows:

"(d) Additional Requirements. Additional site-specific requirements for the treatment and disposal of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that has been treated for beneficial use, may be established on a case-by-case basis."

Comment

Commission Shift, Sierra Club, Glenrose Engineering, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy in Texas, Hill County Alliance, WildEarth Guardians, Healthy Gulf, and individuals expressed concerns about pollutant accumulation from land application activities. Additionally, Healthy Gulf and individuals commented that the rules should require bioaccumulation tracking.

Response

The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through irrigation.

During technical review, TCEQ staff establish appropriate site-specific effluent limitations, irrigation rates, and any special provisions necessary to ensure the protection of water quality, health, and the environment in the land application permit. Irrigation rates established in an issued TLAP are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants, and may include lifetime loading limits for certain pollutants if needed to ensure the permit is protective of water quality, health, and the environment.

Comment

Individuals expressed concerns that produced water is not like wastewater from domestic, agricultural, or other industrial sources. Commentors recommended that TCEQ create separate regulations for produced water. CMV Consulting LLC commented that separate rules should be developed for land application of produced water over the Carrizo aquifer.

Response

TCEQ follows the methodology and procedures outlined under 30 TAC Chapter 309 to evaluate an application to dispose of treated effluent. Based on technical reviews of the application and proposed activities, TCEQ staff develop a permit that establishes effluent limitations and permit requirements that are expected to protect human health and the environment.

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent. A TLAP does not authorize the discharge of pollutants off site or into water in the State.

Additional site-specific provisions may be established in an issued land application permit as necessary to ensure protection of groundwater resources. The rule also provides for regulatory flexibility when establishing requirements under 30 TAC §309.13(c) in a permit by allowing TCEQ to consider exceptions and establish alternative provisions if the alternative provides adequate protection of potable water sources and supplies.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance expressed concern about setback distances 30 TAC §309.13(c)(1) - (6) and commented that larger setback distances are needed to ensure protection of water resources from land irrigation with industrial wastewater, including produced water, as well as Sierra Club, Greater Edwards Aquifer Alliance, National Wildlife Federation, Galveston Bay Foundation, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, Future Heist, Healthy Gulf, Community Advocate and other individuals. Greater Edwards Aquifer Alliance also expressed concern and recommended that the required setbacks be revised to one-acre from water supply wells for land application of produced water. Sierra Club commented that the proposed setback at 30 TAC §309.13(c)(6) should be greater and requested TCEQ provide the technical basis for the proposed distances and demonstrate why they are protective of the environment and public health. The Texas Industry Project expressed concern about the proposed requirement at 30 TAC §309.13(c)(6) and requested removal. The Texas Industry Project noted the provision may cause a broad suite of facilities to be out of compliance with TCEQ rules and it addresses conditions beyond those required to be addressed under SB 1145, and recommend it be removed. Alternatively, The Texas Industry Project suggested that the distance limit should (1) expressly apply only to new units, not units that were authorized or constructed prior to the effective date of the final rule and (2) expressly allow case-by-case exceptions as approved by the Executive Director. Future Heist commented that the proposed requirement at 30 TAC §309.13(c)(6) fails to account for slope. Future Heist and individuals requested the rules establish setbacks for neighborhoods, schools, daycares, and community centers.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use. An individual TLAP does not authorize the discharge of pollutants off site or into water in the state, including groundwater.

Requirements under 30 TAC §309.13(c) would establish distances required to locate a wastewater treatment unit (including an irrigation area) from water features. These requirements are expected to be protective of groundwater, surface water, and public health in the event of an unauthorized discharge or significant rain event that could cause run off from an irrigation area.

The proposed 100-foot setback under 30 TAC §309.13(c)(6) is a standard provision included in issued TLAPs that authorize the disposal of industrial wastewaters through land application. This provision ensures protection of water in the state from land application activities and is consistent with existing buffer zone requirements for land application activities already authorized by the commission under 30 TAC §222.81 relating to Subsurface Area Drip Dispersal Systems (SADDS) and 30 TAC §§321.40(h), 321.48(e)(6), and 321.409(1) relating to CAFOs.

Additional site-specific provisions may be established in an issued land application permit as necessary to ensure protection of groundwater resources. However, the rule also provides for regulatory flexibility when establishing requirements under 30 TAC §309.13(c) in a permit by allowing TCEQ to consider exceptions and establish alternative provisions if the alternative provides adequate protection of potable water sources and supplies.

Comment

Healthy Gulf and individuals expressed concern about accountability. Glenrose Engineering, WildEarth Guardians, and individuals expressed concern about TCEQ's ability to enforce a TLAP for treated produced water. Sierra Club and individuals expressed concern that the proposed rules do not contain enforcement requirements for the land application of treated produced water. Meta Midstream expressed concern about the lack of additional record-keeping requirements in the proposed rule.

Response

A TCEQ-issued permit contains enforceable requirements and provisions to ensure accountability for permit holders in the operation of their facility and land application area(s). A permit holder is required to maintain records and notify the agency if the effluent does not meet the permit conditions according to the requirements established in the permit. In addition, TCEQ regional staff may sample the effluent during routine inspections or in response to a complaint.

A land application permit holder is subject to administrative, civil, and criminal penalties, as applicable, under TWC, §§7.051 - 7.075 (relating to Administrative Penalties), 7.101 - 7.111 (relating to Civil Penalties), and 7.141 - 7.202 (relating to Criminal Offenses and Penalties) for violations including, but not limited to, negligently or knowingly violating the federal Clean Water Act (CWA) §§301, 302, 306, 307, 308, 318, or 405, or any condition or limitation implementing any sections in a permit issued under CWA §402.

Penalties, including the monetary amount of administrative fines, are determined by the TCEQ Enforcement Division and depend on the nature and extent of the violation(s).

Comment

Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, WildEarth Guardians, Community Advocate, Healthy Gulf, and individuals expressed concern about agency oversight for a land application permit for treated produced water. Commentors recommended TCEQ revise the rule to include requirements such as independent testing, additional or continuous monitoring requirements, and livestock monitoring requirements.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use.

All wastewater treatment facilities and land application areas must be operated and maintained consistent with applicable TCEQ rules. An issued permit describes the conditions under which a specific wastewater facility must operate and will include provisions that require the facility and land application site(s) to be properly operated and maintained at all times.

Monitoring requirements established in an issued permit are based on TCEQ guidance documents for establishing monitoring frequencies. The monitoring frequencies in a draft permit can be increased or decreased based on an Applicant's ability to demonstrate compliance with the permitted effluent limitations.

TCEQ's Office of Compliance and Enforcement ensures compliance with applicable state and federal regulations. The appropriate regional office conducts a mandatory comprehensive compliance investigation (CCI) at EPA-classified minor facilities once every five fiscal years. Additional mandatory investigations can be required if the facility is categorized as significant noncompliance (SNC). SNC is determined by the Compliance Monitoring Section of TCEQ and is based on self-reported effluent violations.

Comment

Hinds Feat requested that TCEQ develop an expedited permitting route for land application of produced water.

Response

The executive director is proposing to amend Chapter 210 to include treated produced water as a wastestream eligible for reuse to create an accelerated authorization route for the land application of produced water that is treated for beneficial use. Industrial reclaimed water authorizations issued under Chapter 210 are reviewed and issued following a streamlined approach, typically taking about two months to obtain.

Industrial reuse activities that may be authorized under Chapter 210 are much smaller in scale and must adhere to the criteria, requirements, and prohibitions outlined in the Chapter, thus requiring significantly less technical review and oversight. Industrial reuse applications do not require public notice or offer an opportunity for a contested case hearing, which also reduces the timeframes needed to obtain an authorization.

Comment

The Texas Industry Project and Texas Oil and Gas Association expressed concerns about creating an inconsistency within the rules because the proposed definition of "produced water" at 30 TAC §309.11(9) incorporates by reference the definition at 30 TAC §305.541(b), which specifically mentions discharges into water in the state.

Response

The proposed definition has been revised as follows:

Produced water - is defined for the commission's implementation of Texas Water Code, §26.131(e), all wastewater associated with oil and gas exploration, development, and production activities, except hydrostatic test water and gas plant effluent.

Comment

Sierra Club commented that the proposed rules should include a definition for "treated produced water". The Texas Industry Project requested the addition of a definition for "treated produced water fluids", as follows:

"…for purposes of this Chapter 309, produced water that has been treated for beneficial use and is land applied. For purposes of this Chapter 309, the definition does not include those treated wastewaters that are industrial reclaimed water as defined by 30 TAC 210.52 and regulated under Chapter 210 or that are treated fluid as defined by 16 TAC 4.110 and regulated by the Railroad Commission of Texas."

Response

The executive director declines to include a definition for produced water that is treated for beneficial use and land applied.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance expressed concern about the existing definition of "new facility," which includes only domestic wastewater treatment facilities.

Response

To clarify applicability to both domestic and industrial wastewater treatment facilities, the definition for "New Facility" has been revised to "Any wastewater treatment facility which is not an existing facility."

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance recommended the addition of a definition for the term "domestic raw water supply."

Response

The executive director declines to include a definition for "domestic raw water supply." TCEQ rules and regulations related to raw water supply are located under 30 TAC Chapter 290 (relating to Public Drinking Water). TCEQ defines raw water supply conceptually as untreated surface water entering a domestic water treatment plant.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance recommended the addition of a definition for the term "agricultural practice."

Response

The executive director declines to include a definition for "agricultural practices". Definitions for "agriculture or agricultural" and "agricultural use" are established under TCEQ rules located at 30 TAC Chapter 297 (relating to Water Rights).

Comment

The Sierra Club (Lone Star Chapter) commented that the proposed rules should include a definition for "land application."

Response

The executive director declines to include a definition for "land application." Land application activities that may be authorized under Chapter 309 include the disposal of treated effluent by surface irrigation, drainfields, or subsurface land application, unless otherwise prohibited by state or federal rules or statute.

Comment

NGL Water Solutions Permian, LLC, Texas Oil and Gas Association, Texas Industry Project, National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance expressed concerns about applicability of requirements for treatment and disposal of domestic wastewater to industrial wastewater, including produced water. Texas Oil and Gas Association, NGL Water Solutions Permian, Texas Industry Project, National Wildlife federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance recommended revisions to remove ambiguity and ensure that provisions applicable only to domestic wastewater treatment facilities do not inadvertently apply to land application of industrial wastewater or treated produced water.

Response

The following revisions to the proposed rule text for Chapter 309 have been made to clarify the applicability of requirements that are explicitly for the treatment and disposal of domestic wastewater:

30 TAC §309.1(b) and (e), 30 TAC §309.10(a)(2), and 30 TAC §309.13(e) - (i) have been revised to clarify applicability of the requirement to treated domestic sewage or industrial land application, as appropriate.

30 TAC §309.10(a)(1) has been revised as follows:

(1) This subchapter establishes minimum standards for the location of domestic wastewater treatment facilities and land application of industrial wastewater, including produced water under Tex. Water Code §26.131(e) that is treated for beneficial use. These standards are to be applied in the evaluation of an application for a permit to:

(A) treat and dispose of domestic wastewater;

(B) treat and dispose of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use;

(C) obtain approval of construction plans and specifications for domestic wastewater treatment facilities."

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance commented that proposed rule language at 30 TAC §309.2(b) should be revised from "may" to "must".

Response

The executive director acknowledges this comment; however, no revisions to this subsection were proposed to implement SB 1145 or clarify TCEQ's land application permitting program as it relates to disposal of industrial wastewaters.

Comment

The Texas Industry Project requested TCEQ include a "nondisturbance" provision under 30 TAC §309.10, as follows:

"This chapter does not apply to the management, transport, storage, recycling, or impoundment of produced water or treated produced water fluids prior to being applied to land for irrigation or other beneficial use."

Response

The executive director declines to include a "nondisturbance" provision for oil and gas waste. However, the executive director acknowledges that the proposed rules do not apply to the management, transport, storage, recycling, or impoundment of produced water or treated produced water fluids prior to being applied to land for irrigation or other beneficial use. Jurisdictional boundaries between TCEQ and RRC are established in the Memorandum of Understanding between TCEQ and RRC located at 30 TAC §7.117.

Comment

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, and Hill County Alliance commented that proposed revisions at 30 TAC §309.20 are inadequate to ensure protection from land irrigation with industrial wastewater, including produced water. The commentors requested that 30 TAC §309.20(a)(4) be revised to require groundwater testing and monitoring to protect groundwater quality resources as well as livestock and wildlife that obtain water from those resources. They also requested revisions of 30 TAC §309.20(b) to expand scope relating to crop irrigation, primary and secondary effluent requirements, design analysis, and soil testing requirements to ensure the requirements apply to and are appropriate to be protective for irrigation with treated produced water.

Response

The proposed rules would clarify that Chapter 309 establishes the minimum requirements for disposal of treated produced water through land irrigation to ensure protection of water quality (including groundwater), human health, and the environment, and would be consistent with TCEQ's Texas land application permitting program. No discharge of pollutants into water in the state is authorized under an individual TLAP and it is therefore expected to be protective of groundwater and potable water resources. Additional site-specific provisions may be established on a case-by-case basis to ensure an issued permit is protective for irrigation with produced water that is treated for beneficial use.

Comment

An individual commented that the proposed rules should require a redemonstration of compliance to obtain a permit to land-apply produced water.

Response

As described, entities seeking to land-apply treated effluent are required to provide analytical data with their application that is representative of the proposed effluent to be land-applied.

Following issuance of a land application permit, the permittee is required to analyze the treated effluent prior to conducting land application activities. The permittee is also required to maintain monthly reports of the results of the effluent analyses and flow measurements for a minimum of three years. A permittee may either collect and analyze the effluent samples themselves, or it may contract with a third party for either or both the sampling and analysis. However, all samples must be collected and analyzed according to 30 TAC Chapter 319, Subchapter A. The permittee is required to further notify the agency if the effluent does not meet the permit limits according to the requirements in the permit. In addition, TCEQ regional staff may sample the effluent during routine inspections or in response to a complaint.

Based on staff review, TCEQ may establish additional site-specific monitoring requirements as necessary to assure protection of water quality, human health, and the environment.

Comment

Future Heist, WildEarth Guardians, and individuals commented that TCEQ should require financial assurance to obtain a permit to land-apply treated produced water.

Response

TCEQ develops rules and requirements for financial assurance when authority to do so is provided by State or Federal law. Inclusion of financial assurance requirements goes beyond the authority provided under TWC, §26.131.

However, an issued TLAP would not limit anyone's ability to seek legal remedies from the owner or operator (i.e., permittee) regarding any potential trespass, nuisance, or other cause of action in response to the proposed facility's activities that may result in injury to human health or property or interfere with the normal use and enjoyment of property.

Comment

Glenrose Engineering commented 30 TAC §213.3(28)(B)(iii), which exempts activities associated with the exploration, development, and production of oil, gas, or geothermal resources under the jurisdiction of RRC should be amended to clarify that land application of produced water associated with the exploration, development, and production of oil, gas, or geothermal resources for either disposal or beneficial use is a regulated activity under 30 TAC §213.

Response

The executive director acknowledges this comment. Any revisions needed to Chapter 213 would be conducted under a separate rulemaking.

Comment

Glenrose Engineering expressed concern that the proposed rules, under 30 TAC Chapter 210 are inadequate for treated produced water, including the lack of additional effluent limitations, monitoring requirements and frequencies, or setbacks, and recommended the proposed rule be revised to include continuous effluent monitoring requirements, soil and groundwater monitoring on a quarterly basis. Glenrose Engineering also expressed concerns about the allowable reuse activities and irrigation practices under the proposed rules, including the type of authorization required (Level I versus Level II authorization).

Response

Chapter 210, Subchapter E, establishes requirements for industrial reclaimed water which may be used instead of potable or raw water sources for purposes such as landscape irrigation, dust suppression, and impoundment maintenance. This proposed rulemaking would amend Chapter 210 to establish the minimum requirements for the reuse of produced water that is treated for beneficial use.

A Level I authorization for industrial reclaimed water, including treated produced water, provides coverage for on-site reuse without notification to, or written approval from, TCEQ. Eligible wastestreams listed under 30 TAC §210.53(a) may be used in accordance with end uses listed under 30 TAC §210.56(b)(2) and must not contain measured effluent concentrations above the thresholds listed in Table 30 TAC §210.53(a)(9) or above the minimum analytical level for all other priority pollutants in 40 Code of Federal Regulations (CFR), Part 122 Appendix D, Tables II and III.

A Level II authorization for industrial reclaimed water, including treated produced water, provides coverage for on- or off-site reuse after notification is made and written approval is received from TCEQ.

While the proposed revisions to Chapter 210 would establish the minimum requirements for reuse of produced water that is treated for beneficial reuse, additional site-specific effluent limitations and provisions may be established in an issued industrial reuse authorization to ensure protection of water quality, human health, and the environment. If issued, the permittee would be required to comply with the effluent limitations, monitoring frequencies, and reporting requirements established in the industrial reuse authorization.

However, the executive director may also require a land application permit for the proposed reuse activity depending on the proposed volume of treated effluent to be reused, technical complexity of the proposed reuse activity, or quality of the treated effluent to use reused, including produced water that is treated for beneficial use.

Comment

Sierra Club commented that the proposed rule does not include discharge standards specifically designed for treated produced water.

Response

A land application permit for disposal of treated effluent (including produced water treated for beneficial use) does not authorize the discharge of pollutants off-site or into water in the State.

Concerns related to the Rulemaking Process

Comment

Commission Shift, Earthworks, Clean Water Action/Clean Water Fund, Sierra Club, Greater Edwards Aquifer Alliance, Future Heist, Healthy Gulf, and individuals expressed concerns about the public notice and requested an extension of the public comment period.

Response

Consistent with the requirements of 30 TAC Chapter 39, notice of the rulemaking as well as the public hearing on the proposed rule, and proposed rule text were published in the Texas Register on May 15, 2026. A hybrid in-person and virtual public hearing was held at TCEQ on June 15, 2026. The public comment period began on the date of publication and ran until the close of the business on the following day, June 16, 2026. The executive director declines to extend the public comment period on this rulemaking.

Comment

The Sierra Club and individuals commented that any standards developed for the land application of treated produced water should receive notice and opportunity for public input.

Response

Any subsequent rulemakings that the executive director may undertake to adopt additional standards for the land application of treated produced water will comply with TCEQ rules under 30 TAC Chapter 39 (relating to Public Notice) and all applicable public participation requirements to ensure opportunity for public input.

Comment

Future Heist expressed concerns about transparency in the rulemaking process.

Response

Updates regarding this rulemaking have been provided at the executive director's quarterly Water Quality Advisory Work Group meetings. The executive director's staff also have been available throughout the rulemaking process for questions. Filings related to the proposed rulemaking, including the notice, proposed rule text, and descriptions and basis for the proposed changes were available through the Commissioners' Integrated Database for early review by the general public on April 10, 2026, and linked to the Commissioners' Meeting Agenda available on TCEQ's website. Notice of the rulemaking, as well as the public hearing on the proposed rule, and proposed rule text were published in the Texas Register on May 15, 2026. A hybrid in-person and virtual public hearing was held at TCEQ on June 15, 2026. The public comment period began on the date of publication and ran until the close of the business on the following day, June 16, 2026.

Comment

Commission Shift, Earthworks, Clean Water Action/Clean Water Fund, Sierra Club, Future Heist, Community Advocate, Healthy Gulf, and individuals expressed concern about the single public hearing offered on this rulemaking and requested additional in-person and virtual public meetings or hearings on this rulemaking in impacted communities, including rural communities, across the Permian Basin, the Eagle Ford Shale, and the East Texas Basin.

Response

A hybrid in-person and virtual public hearing was held at TCEQ on June 15, 2026. Ten people attended in person and 75 external participants attended virtually. The executive director's staff have been available throughout the rulemaking process. The executive director declines to hold additional public meetings or hearings on this rulemaking.

Comment

The Texas Industry Project suggested TCEQ consider gathering additional stakeholder input to define features that would not be considered "water in the state" for purposes of this rule (e.g., exempt ditches, etc.).

Response

The executive director acknowledges this comment.

Comment

Healthy Gulf expressed concerns about TCEQ Public Costs and Benefits analysis and recommended that TCEQ revise its analysis to acknowledge the potential costs of contaminated groundwater, soil degradation, and public health harm associated with land application of produced water.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with Texas Government Code (TGC), 2001.024. TLAPs authorize the disposal of wastewater by irrigation, only. A TLAP does not authorize the discharge of pollutants off site or into waters in the state and prohibit any unauthorized discharges. As previously discussed, an issued TLAP will contain site-specific application rates to ensure effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants. TCEQ also develops and includes special provisions in a TLAP to prevent surface and groundwater contamination and runoff. The site-specific effluent limits and additional permit requirements that are established in an issued land application permit are expected to assure protection of water quality, human health, and the environment.

As such, TCEQ staff determined that the public benefit will be rule language that provides clarity and establishes minimum requirements regarding how TCEQ would issue permits for the land application of industrial wastewater, including produced water for beneficial use as authorized by SB 1145. The determination also concluded that the public will benefit from the clarity of promulgated requirements related to the location of wastewater treatment plant units or effluent used for irrigation in relation to waters of the state (30 TAC §309.13(d)(2)), as well as from other various clarifications in the rule. The addition of the requirements proposed in the rule would lead to increased protection of water quality in the waters of the state and the land application of produced water may lead to the increased availability of water for beneficial reuse.

Comment

Healthy Gulf expressed concerns about TCEQ's "Major Environmental Rule" analysis. Healthy Gulf commented rulemaking implicates the economy, agricultural productivity, public health, and the environment in ways that plainly meet the threshold for major environmental rule status.

Response

The executive director acknowledges this comment. No change was made in response to this comment. TCEQ staff reviewed the proposed rule amendments in a manner consistent with TGC, 2001.0225.

A "Major environmental rule" is defined as a rule, the specific intent of which, is to protect the environment or reduce risks to human health from environmental exposure and that may adversely affect in a material way the economy, a sector of the economy, productivity, competition, jobs, the environment, or the public health and safety of the state or a sector of the state.

The proposed rulemaking is not specifically intended to protect the environment or reduce risks to human health from environmental exposure. Rather, it intends to implement SB 1145, which amended TWC, §26.131 and transferred permitting authority from RRC to TCEQ of applications filed on or after September 1, 2025, for the land application of produced water that is treated for beneficial use, and to clarify applicability to the land application of industrial wastewater, including produced water under TWC, §26.131 and establish minimum requirements for land application of produced water.

This rulemaking would not: 1) exceed a standard set by federal law; 2) exceed an express requirement of state law; 3) exceed a requirement of a delegation agreement or contract between the state and an agency or representative of the federal government to implement a state and federal program; or 4) adopt a rule solely under the general powers of the agency instead of under a specific state law. Specifically, TWC, §26.131 authorizes the commission to issue permits for the land application of produced water; §26.027, which authorizes the commission to issue permits; and §26.121, which authorizes the commission to prohibit unauthorized discharges. Therefore, this proposed rulemaking does not fall under any of the applicability criteria in TGC, §2001.0225.

Comment

Healthy Gulf expressed concerns about TCEQ's analysis of potential impacts on rural communities and recommended that TCEQ prepare and publicly share a full Rural Communities Impact Assessment, establish specific science-based setback distances and contaminant standards that account for the disproportionate rural exposure, and ensure that rural communities have meaningful access to permit information and the ability to participate in permitting decisions before this rule is finalized.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with TGC, §2006.002.

The proposed amendments would apply statewide and have the same effect in rural communities as in urban communities. They are consistent with TCEQ's Texas land application permitting program and establish the minimum requirements for disposal of treated produced water through land application. As previously discussed, TCEQ reviews proposed land application activities and establishes site-specific effluent limits and additional permit requirements in an issued land application permit as necessary to ensure the protection of water quality, human health, and the environment. Additionally, as previously stated, TLAPs are subject to TCEQ's public participation rules under 30 TAC Chapters 39, 55, and 80, which will provide ample opportunity for interested persons to participate in permitting decisions.

Comment

Individuals expressed concerns about impacts to the state and local economy. Additionally, Healthy Gulf expressed concerns about TCEQ's analysis of potential impacts on the state economy and local economies and recommended that TCEQ conduct and publicly share a full Local Employment Impact Statement focused specifically on agricultural communities in areas where land application permits are most likely to be sought, with sufficient time for public review before the rule is finalized.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with applicable provisions of the TGC, including §§2001.022 and 2001.024.

Entities seeking to land apply treated produced water who were previously able to obtain a permit from RRC would now be required to obtain a land application permit or TLAP from TCEQ. A landowner must provide authorization to land apply treated effluent, including treated produced water, to their land. Additionally, as previously stated, TLAPs are subject to TCEQ's public participation rules under 30 TAC Chapters 39, 55, and 80. These requirements are not expected to adversely affect the state or local economies in a material way.

Comment

Future Heist expressed concerns about inconsistencies in the Growth and Government Impact Statement.

Response

TCEQ staff reviewed the proposed rule amendments in a manner consistent with TGC, §2001.0221.

TCEQ already has the ability to issue land application permits for disposal of treated effluent (including treated produced water) under Chapter 309. Entities seeking to land apply treated produced water who were previously able to obtain a permit from RRC are now required to obtain a land application permit or TLAP from TCEQ; further, TCEQ already has a land application permitting program established. This rulemaking clarifies the applicability of that permitting program and not expanding it.

TCEQ staff prepared an accurate Government Growth Impact Statement which determined that the proposed rulemaking does not create or eliminate a government program and will not require an increase or decrease in future legislative appropriations to the agency; does not require the creation of new employee positions, eliminating current employee positions, nor require an increase or decrease in fees paid to the agency; amends an existing regulation, but does not create, expand, repeal, or limit the regulation; and does not increase or decrease the number of individuals subject to its applicability. Therefore, TCEQ staff concluded that the proposed rule should not impact positively or negatively the state's economy.

Comment

Individuals commented that additional studies should be required prior to the proposing rules for land application of treated produced water.

Response

The executive director is reviewing existing effluent data available from RRC and pilot programs conducted under their jurisdiction, as well as application materials from applicants seeking a land application permit under TWC, Chapter 26 to determine if additional parameters will be added to the pollutant analysis suite requested in the water quality permit application for land application of treated produced water. A future rulemaking may be conducted to add performance-based effluent limitations or additional permit requirements for treated produced water, as appropriate to ensure the protection of water quality, human health, and the environment.

Comment

Sierra Club requested TCEQ to consider pausing this rulemaking to create an informal draft and stakeholder group.

Response

The executive director acknowledges this comment.

Concerns related to the Permitting Process

Comment

Individuals commented that permit recipients must have good compliance histories.

Response

During the technical review of an application, TCEQ reviews the Applicant's compliance history according to the rules in 30 TAC Chapter 60.

Comment

Sierra Club commented that the proposed rule's reliance on case-by-case permit evaluations and professional judgement raises transparency and consistency concerns. Sierra Club, Greater Edwards Aquifer Alliance, Future Heist, Nature Conservancy, WildEarth Guardians, Community Advocate, Healthy Gulf, and individuals expressed concerns about transparency in the land application permitting process for produced water that is treated for beneficial use.

Response

This proposed rulemaking would establish the minimum requirements for land irrigation with produced water that is treated for beneficial use. Additional, site-specific requirements beyond the requirements of Chapter 309 may be established in an issued permit as necessary to ensure protection of water quality, human health, and the environment.

As previously stated, the proposed rules would be consistent with TCEQ's land application permitting program. Applications submitted to obtain a TLAP under TWC, Chapter 26 are subject to all applicable TCEQ rules, regulations, and prohibitions, including but not limited to those under 30 TAC Chapters 39 (relating to Public Notice), 55 (relating to Requests for Reconsideration and Contest Case Hearing; Public Comment), and 80 (relating to Contested Case Hearings).

TCEQ rules provide opportunities for transparency during the process to obtain a land application permit.

Specifically, there are two public notices regarding this permit action, the Notice of Receipt of Application and Intent to Obtain a Wastewater Permit (NORI) and the Notice of Application and Preliminary Decision (NAPD). TCEQ's notice rules require applicants to provide public notices for wastewater permits by publishing the NORI in a "newspaper of largest circulation in the county in which the facility is located or proposed to be located … if the facility is located or proposed to be located in a municipality, the applicant publish notice in any newspaper of general circulation in the municipality." After the Office of the Chief Clerk has mailed the preliminary decision and the NAPD to the applicant, they are required to publish the NAPD "at least once in a newspaper regularly published or circulated within each county where the proposed facility or discharge is located and in each county affected by the discharge."

TCEQ's notice rules for a new permit or major amendment require mailed notice of the NORI and NAPD to landowners named on the application map and persons on the mailing list maintained by the Office of the Chief Clerk. An applicant is required to submit a landowner map as part of the application materials. The landowner map must include the property boundaries of landowners surrounding the applicant's property and the property boundaries of all landowners surrounding the discharge point and on both sides of the discharge route for one full stream mile downstream of the discharge point. Additionally, any persons who submit a comment or contested case hearing request prior to the end of the public comment period are added to the mailing list for that permit action.

An applicant must place a physical copy of all application materials in a public viewing location (described in both public notices). In addition, TCEQ must make an exact electronic copy of all applications materials available online for applications submitted on or after June 1, 2024.

Comment

Greater Edwards Aquifer Alliance, Meta Midstream, Sierra Club, WildEarth Guardians, Community Advocate, Healthy Gulf, and individuals expressed concern about agency oversight for a land application permit for treated produced water. Commentors recommended TCEQ revise the rule to include requirements such as independent testing, additional or continuous monitoring, and livestock monitoring requirements.

Response

All wastewater treatment facilities and land application areas must be operated and maintained consistent with applicable TCEQ rules. An issued permit describes the conditions under which a specific wastewater facility must operate and will include provisions that require the facility and land application site(s) to be properly operated and maintained at all times.

Additionally, monitoring requirements established in the proposed permit are based on TCEQ guidance documents for establishing monitoring frequencies and are typically set at the most stringent allowable for applicants that do not demonstrate a significant potential to exceed the permitted limitations. The monitoring frequencies in a draft permit can be increased or decreased based on an Applicant's ability to demonstrate compliance with the permitted effluent limitations.

TCEQ's Office of Compliance and Enforcement ensures compliance with applicable state and federal regulations. The appropriate regional office conducts a mandatory comprehensive compliance investigation (CCI) at EPA-classified minor facilities once every five fiscal years. Additional mandatory investigations can be required if the facility is categorized as significant noncompliance (SNC). SNC is determined by the Compliance Monitoring Section of TCEQ and is based on self-reported effluent violations.

Concerns Outside of TCEQ Jurisdiction

Comment

WildEarth Guardians commented that the proposed rules should address flood risks.

Response

TLAPs authorize the disposal of wastewater by irrigation, only. A TLAP does not authorize the discharge of pollutants off-site or into waters in the state and prohibits any unauthorized discharges.

TCEQ does not have jurisdiction to address flooding or erosion issues in the wastewater permitting process. The permitting process for land application of wastewater is limited to prohibiting the discharge of pollutants into water in the state. Irrigation rates established in a TLAP are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, or ponding. Additionally, TLAPs prohibit irrigation during a significant rainfall event. If issued, the permittee would be required to comply with the limitations, requirements, and prohibitions established in their permit and would not be expected to contribute to flooding or erosion.

For flooding concerns, please contact the local floodplain administrator for this area. If you need help finding the local floodplain administrator, please call TCEQ Resource Protection Team at (512) 239-4691.

Comment

An individual commented that they should have the right to sue.

Response

Issuance of a Texas Land Application permit for treated produced water does not limit the ability of an individual to seek legal remedies against an applicant regarding any potential trespass, nuisance, or other causes of action in response to activities that may result in injury to human health or property, or that may interfere with the normal use and enjoyment of property. For concerns, please contact local law enforcement or County Sheriff's Office to inquire if there are ordinances in your area.

Comment

An individual expressed concerns about potential impacts to property.

Response

TWC, §26.027 makes clear that TCEQ may issue permits for disposal and dispersal of wastewater adjacent to water in the State through the executive director's evaluation of TLAP applications using the information provided in an application and recommending issuance or denial based on the application's compliance with the TWC and TCEQ rules.

However, an issued land application permit would not limit anyone's ability to seek legal remedies from the permit holder regarding any potential trespass, nuisance, or other cause of action in response to the permitted activities that may result in injury to property or interfere with the normal use and enjoyment of property.

Comment

Hinds Feat commented about potential mineral recovery from produced water and oil and gas exploration activities.

Response

Mineral recovery cannot be addressed in the review of water quality application, as the scope of the executive director's jurisdiction in a land application permit is limited to the issues set out by statute. The land application rules do not prohibit the recovery of minerals from produced water.

Comment

Individuals commented on other potential uses for treated produced water, including for data centers. An individual also commented about alternative disposal options for treated produced water.

Response

TCEQ does not have the authority to mandate the method of disposal of treated effluent or use of alternative disposal options if the applicant adheres to the rules and provisions under TWC, Chapter 26 and 30 TAC Chapters 305, 307, and 309. The proposed rules would not limit potential uses for produced water that is treated for beneficial use.

Comment

Clean Water Action/Clean Water Fund, WildEarth Guardians, Future Heist, and Truckers Movement for Justice questioned how biosolids and byproducts from treatment of produced water would be addressed in a TCEQ permit to land irrigate with produced water.

Response

Any wastewater, biosolids, or other wastes generated during the treatment of produced water are considered oil and gas wastes. Management and disposal authority for oil and gas waste remains under the jurisdiction of RRC.

Comment

The Texas Oil and Gas Association questioned if this proposed rulemaking would alter spill reporting obligations to RRC, except when an unauthorized discharge of wastewater into or adjacent to water in the state would be reported to TCEQ as an element of the TPDES or TLAP permit requirements.

Response

No, this proposed rulemaking is not expected to alter spill reporting obligations to the RRC. However, TCEQ permittees would be required to report unauthorized discharges under the TCEQ-issued permit requirements.

Comment

The Texas Oil and Gas Association expressed concerns about potential impacts to surface impoundments under the proposed rules.

National Wildlife Federation, Galveston Bay Foundation, Sierra Club, Bayou City Waterkeeper, Nature Conservancy, Hill County Alliance, and an individual expressed concern about the potential public and wildlife exposure to stored treated produced water.

Response

The revised statute transferred jurisdiction over disposal of produced water that is treated for beneficial reuse by land application. Jurisdiction over the management, including treatment and storage, and disposal of produced water via evaporation in surface impoundments remains under RRC.

Concerns Beyond Scope of Rulemaking

Comment

Greater Edwards Aquifer Alliance expressed concerns about the lack of pretreatment requirements in the proposed rules for land application of treated produced water.

Response

Federal regulations related to pretreatment requirements are located under 40 CFR Part 403 and are applicable to entities that discharge to a publicly-owned treatment work (POTW). These rules do not apply to the disposal of treated produced water by land application.

Comment

Greater Edwards Aquifer Alliance and Future Heist expressed concerns about the lack of remediation requirements in the proposed rules for land application of treated produced water.

Response

TCEQ rules related to remediation requirements are located under 30 TAC Chapter 350, Texas Risk Reduction Program, and are outside of the scope of a water quality permit to land apply treated produced water.

Comment

Future Heist and WildEarth Guardians expressed concerns about the lack of restoration requirements or cleanup standards in the proposed rules for land application of treated produced water.

Response

TCEQ develops rules and requirements to specifically require restoration requirements or cleanup standards when authority to do so is provided by State or Federal law. Inclusion of restoration requirements goes beyond the requirements of the statute under TWC, §26.131.

As previously described, TCEQ establishes site-specific effluent limits and additional permit requirements in the draft permit that are necessary to assure protection of groundwater quality, human health, and the environment. TCEQ establishes irrigation rates in an issued TLAP that are site-specific and based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, ponding, or accumulation of pollutants, as well as any special provisions needed to prevent surface and groundwater contamination and runoff. If issued, the permittee would be required to comply with the effluent limitations and requirements established in the permit.

Spills and runoff are considered unauthorized discharges. An unauthorized discharge is a violation of the proposed permit for which an enforcement action can be brought by TCEQ against a permittee, subject to cleanup standards under 30 TAC Chapter 327 (relating to Spill Prevention and Control).

However, an issued TLAP would not limit anyone's ability to seek legal remedies from the owner or operator (i.e., permittee) regarding any potential trespass, nuisance, or other cause of action in response to the proposed facility's activities that may result in injury to human health or property or interfere with the normal use and enjoyment of property.

Comment

An individual recommended TCEQ develop a freshwater discharge permit for treated produced water.

Response

The executive director acknowledges this comment.

Comment

Individuals expressed general concerns about TCEQ issuing permits for data centers.

Response

The executive director acknowledges this comment.

Comment

Earthjustice commented that TCEQ must ensure the final rule does not exacerbate ongoing issues with underground injection control wells.

Response

TCEQ rules related to underground injection control well requirements are located under 30 TAC Chapter 331 (Underground Injection Control) and are outside of the scope of a water quality permit to land apply treated produced water.

Comment

Glenrose Engineering commented that the rulemaking should be expanded to prohibit the use of subsurface drip disposal for any reclaimed water, including produced water, with total dissolved solids higher than 5,000 mg/L.

Response

The executive director acknowledges this comment. Any revisions needed to Chapter 222 would be conducted under a separate rulemaking.

Comment

Earthjustice requested that the commission adopt methodology and incorporate into rule as a defined process to implement "best professional judgement."

Response

The executive director acknowledges this comment.

Comment

Earthjustice requested that the commission deny all pending applications seeking to dispose of treated produced water by land application.

Response

The executive director acknowledges this comment.

Miscellaneous comments

Comment

An individual requested TCEQ pause these actions to allow more time to research alternatives and evaluate impacts. Individuals requested that TCEQ slow down or go slowly to develop the proposed rules to implement the statute.

Response

The executive director acknowledges these comments.

Comment

An individual asked where land application of produced water would occur.

Response

Land application of produced water that is treated for beneficial use may occur statewide.

Comment

Clean Water Action/Clean Water Fund, Nature Conservancy and individuals expressed concerns about available treatment methods and treatment requirements for produced water.

Response

TCEQ-issued permits establish performance-based requirements that are outcome-focused instead of prescribing specific treatment methods or technology requirements.

Applicants seeking to dispose of treated produced water through land application must describe the treatment methods that will be used to treat effluent in their wastewater permit application. Provisions included in an issued permit require a permittee to notify TCEQ if any information provided in their application changes, such as proposed treatment technologies or methods to comply with the limits and provisions in the permit. TCEQ staff will determine if any additional information or permit actions are needed to accommodate additional or alternative treatment options and methods.

Comment

Grant Hensarling expressed concern about the potential volume of treated produced water that could be land applied.

Response

TCEQ requires applicants to design their proposed irrigation rates according to the land application site's soil and crop requirements and water balance calculations. The irrigation rates are site-specific and are based on agronomic rates to ensure crop growth, nutrient uptake, and effluent retention in the soil to prevent effluent runoff, seepage, and ponding. Also, land application permits require monitoring of the volume applied and analysis of the irrigation effluent at a minimum of once per year. Permits also require the permittee to annually submit the laboratory results from these analyses to the TCEQ Water Quality Assessment Team (MC 150), the appropriate TCEQ Region Office, and the Enforcement Division (MC 224) of TCEQ by the end of September of each monitoring year.

Comment

An individual commented that this rulemaking prioritizes the oil and gas industry's waste disposal convenience over the safety of Texas citizens, soil, and ecosystems. Future Heist and individuals expressed concern that the proposed rulemaking places corporate and financial interest over public interest.

Response

TCEQ's mission is to protect the state's public health and natural resources while supporting sustainable economic growth and development. The agency's goals are focused on clean water, clean air, and safe waste management. Permitting decisions are grounded in law, sound science, common sense, and fiscal responsibility, and TCEQ strives to ensure meaningful public participation throughout the decision-making process. The CWA and TWC, which provide the statutory authority for TCEQ rules and regulations related to the protection of water quality, promote voluntary compliance and operational flexibility in achieving environmental goals.

Comment

WildEarth Guardians expressed concerns about the applicability of the oil and gas exploration and production exemption under RCRA.

Response

The oil and gas exploration and production exemption under the Resource Conservation and Recovery Act (RCRA) excludes certain wastes generated by oil, gas, and geothermal operations from federal hazardous waste regulations under RCRA Subtitle C (see 40 CFR 261.4(b)(5)). However, the exemption does not apply to the disposal of produced water that is treated for beneficial use, which is subject to state-level water quality rules.

As previously stated, this rulemaking would clarify that Chapter 309 establishes the minimum requirements for disposal of produced water that is treated for beneficial use through irrigation to ensure the protection of water quality, human health, and the environment. Any biosolids or other wastes generated during the treatment of produced water are considered oil and gas wastes. Management and disposal authority for oil and gas waste remains under the jurisdiction of RRC.

Comment

Future Heist and WildEarth Guardians expressed concerns about the lack of waste-management requirements under the proposed rules.

Response

Oil and gas wastes, including those generated during the treatment of produced water, are regulated under the jurisdiction of RRC. TCEQ rules for managing industrial solid and hazardous wastes are located under 30 TAC Chapter 335. TCEQ-issued permits for disposal of treated wastewater, including treated produced water, through land application do not authorize the disposal of any solid or hazardous wastes, or absolve an entity from adhering to all applicable state and federal rules and requirements.

Comment

WildEarth Guardians and Earthjustice expressed concern that a TCEQ-issued land application permit could insulate permittees, treatment companies, transporters, landowners, or other responsible parties from otherwise applicable federal or state legal obligations. Future Heist expressed concern that H.B. 49 made compliance with a TCEQ permit a liability shield: a company that puts this treated waste to beneficial use under its permit generally cannot be sued in court by the people it harms, except for gross negligence, an intentional act, or a failure to follow its permit (Tex. Nat. Res. Code §122.003, added by H.B. 49, 2025).

Response

The executive director acknowledges this comment. No changes were made in response to it. As previously stated, TCEQ-issued permits for disposal of treated wastewater, including treated produced water, through land application do not authorize the disposal of any solid or hazardous wastes, or absolve an entity (including permittees and upstream or downstream services or disposal activities) from adhering to all applicable state and federal rules and requirements.

Comment

Earthjustice commented that land application permits for produced water should contain site-specific limits based on soil type, depth to groundwater, proximity to wells and surface water, flood risk, crop type, grazing use, wildlife exposure, and cumulative contaminant loading.

Response

The proposed rules would be consistent with TCEQ's land application permitting program and would clarify that Chapter 309 establishes the minimum requirements for disposal of treated effluent, including produced water that is treated for beneficial use, to ensure protection of human health and public health. Additional site-specific provisions may be established in an issued land application permit on a case-by-case basis to ensure protection of human health and public health.

Comment

Earthjustice questioned if this rulemaking violated the federal prohibition on discharge of produced water west of the 98th meridian.

Response

The federal prohibition located at 40 CFR §435.32 applies to the discharge of produced water or treated produced water into waters of the United States. As previously stated, an issued TLAP does not authorize the discharge of produced water or treated produced water into water in the state.

Changes to the proposed rules:

1. Proposed §309.11(6) has been revised to the following (emphasis added):

"New facility - Any wastewater treatment facility which is not an existing facility."

2. Proposed §309.11(9) has been revised to the following (emphasis added):

"Produced water - is defined for the commission's implementation of Texas Water Code, §26.131(e), all wastewater associated with oil and gas exploration, development, and production activities, except hydrostatic test water and gas plant effluent."

3. Proposed §309.1(b) and (e), 30 TAC §309.10(a)(2), and §309.13(e) - (i) have been revised to clarify applicability of the requirement to treated domestic sewage or industrial land application, as appropriate.

4. Proposed §309.10(a)(1) has been revised as follows:

(1) This subchapter establishes minimum standards for the location of domestic wastewater treatment facilities and land application of industrial wastewater, including produced water under Tex. Water Code §26.131(e) that is treated for beneficial use. These standards are to be applied in the evaluation of an application for a permit to:

(A) treat and dispose of domestic wastewater;

(B) treat and dispose of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use;

(C) obtain approval of construction plans and specifications for domestic wastewater treatment facilities."

5. Proposed 309.20 has been revised to include new provision (d), as follows:

"(d) Additional Requirements. Additional site-specific requirements for the treatment and disposal of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use, may be established on a case-by-case basis."

SUBCHAPTER A. EFFLUENT LIMITATIONS

30 TAC §309.1

Statutory Authority

These amendments to 30 Texas Administrative Code (TAC) Chapter 309 are adopted under the Texas Water Code (TWC). Specifically, TWC, §5.013, which establishes the general jurisdiction of the commission while TWC, §5.102, provides the commission with the authority to carry out its duties and general powers under its jurisdictional authority as provided by TWC, §5.103; TWC, §5.103, which requires the commission to adopt any rule necessary to carry out its powers and duties under the code and other laws of the state; TWC, §5.105, which authorizes the commission to adopt rules and policies necessary to carry out its responsibilities and duties under the TWC; and TWC, §5.120, which requires the commission to administer the law for the maximum conservation and protection of the environment and natural resources of the state. These amendments are also adopted under TWC, §26.027, which authorizes the commission to issue permits for the discharge of waste or pollutants into or adjacent to water in the state; TWC, §26.121, which provides the commission's authority to prohibit unauthorized discharges into or adjacent to water in the state; and TWC, §26.131, which provides the commission's authority to issue permits for the discharge of produced water into water in the state and for the land application of produced water.

The adopted amendments implement TWC, §§5.013, 5.102, 5.103, 5.105, 5.120, 26.027, 26.121, and 26.131.

§309.1. Scope and Applicability.

(a) The purpose of this subchapter is to promulgate a set of effluent quality limitations for treated effluent, which will be required of permittees as appropriate to maintain water quality in accordance with the commission's surface water quality standards. Any incorporation of federal regulations into this chapter shall apply only to disposal of treated effluent.

(b) Secondary treatment requirements for treated domestic sewage, with exceptions applicable to certain stabilization pond systems and other natural systems, is defined as a minimum reduction of pollutants to meet the quality specified in Figure: 30 TAC §309.1(b):

Figure: 30 TAC §309.1(b) (.pdf)

(c) Effective April 1988, all permits containing an ammonia-nitrogen effluent limit are modified to change Biochemical Oxygen Demand (BOD5) to carbonaceous biochemical oxygen demand (CBOD5).

(d) Effective January 1, 1988, any permit containing a BOD5 effluent limitation may be monitored and reported as CBOD5 as long as nitrogen is monitored and reported as ammonia-nitrogen at the same sampling frequency. If the permit authorizes a discharge to land or an evaporation pond only, ammonia-nitrogen monitoring and reporting are not required to change to CBOD5.

(e) For treated domestic sewage, the state of Texas has established a state water quality management program and a continuing planning process which sets forth the strategy and procedures for accomplishing the management program's objectives. Essential elements of the program include updates of basin plans, total maximum daily loads, and wasteload evaluations by basin segments. In order to achieve compliance with water quality standards within certain segments, more stringent effluent quality limitations may be required to protect water quality.

The agency certifies that legal counsel has reviewed the adoption and found it to be a valid exercise of the agency's legal authority.

Filed with the Office of the Secretary of State on November 6, 2026.

TRD-202604700

Amy L. Browning

Deputy Director, Environmental Law Division

Texas Commission on Environmental Quality

Effective date: November 26, 2026

Proposal publication date: May 15, 2026

For further information, please call: (512) 239-2678


SUBCHAPTER B. LOCATION STANDARDS

30 TAC §§309.10, 309.11, 309.13

Statutory Authority

These amendments to 30 Texas Administrative Code (TAC) Chapter 309 are adopted under the Texas Water Code (TWC). Specifically, TWC, §5.013, which establishes the general jurisdiction of the commission while TWC, §5.102, provides the commission with the authority to carry out its duties and general powers under its jurisdictional authority as provided by TWC, §5.103; TWC, §5.103, which requires the commission to adopt any rule necessary to carry out its powers and duties under the code and other laws of the state; TWC, §5.105, which authorizes the commission to adopt rules and policies necessary to carry out its responsibilities and duties under the TWC; and TWC, §5.120, which requires the commission to administer the law for the maximum conservation and protection of the environment and natural resources of the state. These amendments are also adopted under TWC, §26.027, which authorizes the commission to issue permits for the discharge of waste or pollutants into or adjacent to water in the state; TWC, §26.121, which provides the commission's authority to prohibit unauthorized discharges into or adjacent to water in the state; and TWC, §26.131, which provides the commission's authority to issue permits for the discharge of produced water into water in the state and for the land application of produced water.

The adopted amendments implement TWC, §§5.013, 5.102, 5.103, 5.105, 5.120, 26.027, 26.121, and 26.131.

§309.10. Purpose, Scope, and Applicability.

(a) Applicability

(1) This subchapter establishes minimum standards for the location of domestic wastewater treatment facilities and land application of industrial wastewater, including produced water under Tex. Water Code §26.131(e) that is treated for beneficial use. These standards are to be applied in the evaluation of an application for a permit to:

(A) treat and dispose of domestic wastewater;

(B) treat and dispose of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use;

(C) obtain approval of construction plans and specifications for domestic wastewater treatment facilities.

(2) This subchapter applies to domestic wastewater and industrial land application permit applications and construction plans and specifications filed on or after October 8, 1990, for new facilities and substantial changes in the function or use of existing units.

(b) The purpose of this subchapter is to condition issuance of a permit and/or approval of construction plans and specifications for new domestic wastewater treatment facilities or the substantial change in the function or use of an existing unit on selection of a site that minimizes possible contamination of water in the state; to define the characteristics that make an area unsuitable or inappropriate for a wastewater treatment facility; to minimize the possibility of exposing the public to nuisance conditions; and to prohibit issuance of a permit for a facility to be located in an area determined to be unsuitable or inappropriate, unless the design, construction, and operational features of the facility will mitigate the unsuitable site characteristics.

§309.11. Definitions.

The following words and terms, when used in this subchapter, shall have the following meanings, unless the context clearly indicates otherwise.

(1) Active geologic processes--Any natural process which alters the surface and/or subsurface of the earth, including, but not limited to, erosion (including shoreline erosion along the coast), submergence, subsidence, faulting, karst formation, flooding in alluvial flood wash zones, meandering river bank cutting, and earthquakes.

(2) Aquifer--A geologic formation, group of formations, or part of a formation capable of yielding a significant amount of groundwater to wells or springs. Portions of formations, such as clay beds, which are not capable of yielding a significant amount of groundwater to wells or springs are not aquifers.

(3) Erosion--The group of natural processes, including weathering, deterioration, detachment, dissolution, abrasion, corrosion, wearing away, and transportation, by which earthen or rock material is removed from any part of the earth's surface.

(4) Existing facility--Any facility used for the storage, processing, or application of domestic wastewater and which has obtained approval of construction plans and specifications as of March 1, 1990.

(5) Industrial wastewater--As defined in 30 Tex. Admin. Code §210.52(9).

(6) New facility--Any wastewater treatment facility which is not an existing facility.

(7) Nuisance odor prevention--The reduction, treatment, and dispersal of potential odor conditions that interfere with another's use and enjoyment of property that are caused by or generated from a wastewater treatment plant unit, which conditions cannot be prevented by normal operation and maintenance procedures of the wastewater treatment unit.

(8) One hundred-year flood plain--Any land area which is subject to a 1.0% or greater chance of flooding in any given year from any source.

(9) Produced water--Is defined for the commission's implementation of Tex. Water Code, §26.131(e), all wastewater associated with oil and gas exploration, development, and production activities, except hydrostatic test water and gas plant effluent.

(10) Substantial change in the function or use--An increase in the pollutant load or modification in the existing purpose of the unit.

(11) Wastewater treatment plant unit--Any apparatus necessary for the purpose of providing treatment of wastewater (i.e., aeration basins, splitter boxes, bar screens, sludge drying beds, clarifiers, overland flow sites, treatment ponds or basins that contain wastewater, etc.). For purposes of compliance with the requirements of §309.13(e) of this title (relating to Unsuitable Site Characteristics), this definition does not include off-site bar screens, off-site lift stations, flow metering equipment, or post-aeration structures needed to meet permitted effluent minimum dissolved oxygen limitations.

(12) Wetlands--Those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, playa lakes, and similar areas.

§309.13. Unsuitable Site Characteristics.

(a) A wastewater treatment plant unit may not be located in the 100-year flood plain unless the plant unit is protected from inundation and damage that may occur during that flood event.

(b) A wastewater treatment plant unit may not be located in wetlands. (This prohibition is not applicable to constructed wetlands.)

(c) A wastewater treatment plant unit may not be located closer than 500 feet from a public water well as provided by §290.41(c)(1)(B) of this title (relating to Water Sources) nor 250 feet from a private water well. The following separation distances apply to any facility used for the storage, processing, or application of domestic wastewater and industrial wastewater, including produced water under Tex. Water Code §26.131(e) that is treated for beneficial use. Exceptions to these requirements will be considered at the request of a permit applicant on a case-by-case basis, and alternative provisions will be established in a permit if the alternative condition provides adequate protection to potable water sources and supplies.

(1) A wastewater treatment plant unit, or land where irrigation using wastewater effluent occurs must be located a minimum horizontal distance of 150 feet from a private water well.

(2) A wastewater treatment plant unit, or land where irrigation using wastewater effluent occurs, must be located a minimum horizontal distance of 500 feet from an elevated or ground potable-water storage tank as provided by §290.43(b)(1) of this title (relating to Water Storage).

(3) A wastewater treatment plant unit, or land where irrigation using wastewater effluent occurs, must be located a minimum horizontal distance of 500 feet from a public water well site as provided by §290.41(c)(1)(C) of this title, spring, or other similar sources of public drinking water.

(4) A wet well or pump station at a wastewater treatment facility must be located a minimum horizontal distance of 300 feet from a public water well site, spring, or other similar sources of public drinking water as provided by §290.41(c)(1)(B) of this title.

(5) A wastewater treatment plant unit, or land where irrigation using wastewater effluent occurs, must be located a minimum horizontal distance of 500 feet from a surface water treatment plant as provided by §290.42(a)(2)(A) of this title (relating to Water Treatment).

(6) A wastewater treatment plant unit, or land where irrigation using wastewater effluent occurs, must be located a minimum horizontal distance of 100 feet from a water in the state.

(d) A wastewater treatment surface impoundment may not be located in areas overlying the recharge zones of major or minor aquifers, as defined by the Texas Water Development Board, unless the aquifer is separated from the base of the containment structure by a minimum of three feet of material with a hydraulic conductivity toward the aquifer not greater than 10-7 cm/sec or a thicker interval of more permeable material which provides equivalent or greater retardation of pollutant migration. A synthetic membrane liner may be substituted with a minimum of 40 mils thickness and an underground leak detection system with appropriate sampling points. Additional requirements under §217.203 of this title (relating to Design Criteria for Natural Treatment Systems) may apply.

(e) For treated domestic sewage, one of the following alternatives must be met as a compliance requirement to abate and control a nuisance of odor prior to construction of a new domestic wastewater treatment plant unit, or substantial change in the function or use of an existing domestic wastewater treatment unit.

(1) Lagoons with zones of anaerobic activity (e.g., facultative lagoons, un-aerated equalization basins, etc.) may not be located closer than 500 feet to the nearest property line. All other wastewater treatment plant units may not be located closer than 150 feet to the nearest property line. Land used to treat primary effluent is considered a plant unit. Buffer zones for land used to dispose of treated effluent by irrigation shall be evaluated on a case-by-case basis. The permittee must hold legal title or have other sufficient property interest to a contiguous tract of land necessary to meet the distance requirements specified in this paragraph during the time effluent is disposed by irrigation.

(2) The applicant must submit a nuisance odor prevention request for approval by the executive director. A request for nuisance odor prevention must be in the form of an engineering report, prepared and sealed by a licensed Texas professional engineer in support of the request. At a minimum, the engineering report shall address existing climatological conditions such as wind velocity and atmospheric stability, surrounding land use which exists or which is anticipated in the future, wastewater characteristics in affected units pertaining to the area of the buffer zone, potential odor generating units, and proposed solutions to prevent nuisance conditions at the edge of the buffer zone and beyond. Proposed solutions shall be supported by actual test data or appropriate calculations. The request shall be submitted, prior to construction, either with a permit application and subject to review during the permitting process or submitted for executive director approval after the permitting process is completed.

(3) The permittee must submit sufficient evidence of legal restrictions prohibiting residential structures within the part of the buffer zone not owned by the applicant. Sufficient evidence of legal restriction may, among others, take the form of a suitable restrictive easement, right-of-way, covenant, deed restriction, deed recorded, or a private agreement provided as a certified copy of the original document. The request shall be submitted, prior to construction, either with a permit application and subject to review during the permitting process or submitted for executive director approval after the permitting process is completed.

(f) For a domestic wastewater treatment facility for which a permit application, other than a renewal application, is made after October 8, 1990, if the facility will not meet the buffer zone requirement by one of the alternatives described in subsection (e) of this section, the applicant shall include in the application for the discharge permit a request for a variance. A variance will be considered on a case-by-case basis and, if granted by the commission, shall be included as a condition in the permit. This variance may be granted by the commission, consistent with the policies set out in Texas Water Code, §26.003.

(g) For treated domestic sewage, any approved alternative for achieving the requirements of this section must remain in effect as long as the wastewater treatment plant is permitted by the commission. To comply with this requirement, the permittee must carry out the nuisance odor prevention plan at all times, shall ensure sufficient property ownership or interest and shall maintain easements prohibiting residential structures, as appropriate.

(h) For a permitted domestic wastewater treatment facility undergoing renewal of an existing permit with plans and specifications approved prior to March 1, 1990, for which no design change is requested, the facility will not be required to comply with the requirements of this section.

(i) Domestic wastewater treatment facilities for which plans and specifications have been approved prior to March 1, 1990, are not required to resubmit revised plans and specifications to meet changed requirements in this section in obtaining renewal of an existing permit.

The agency certifies that legal counsel has reviewed the adoption and found it to be a valid exercise of the agency's legal authority.

Filed with the Office of the Secretary of State on November 6, 2026.

TRD-202604701

Amy L. Browning

Deputy Director, Environmental Law Division

Texas Commission on Environmental Quality

Effective date: November 26, 2026

Proposal publication date: May 15, 2026

For further information, please call: (512) 239-2678


SUBCHAPTER C. LAND APPLICATION OF TREATED EFFLUENT

30 TAC §309.20

Statutory Authority

These amendments to 30 Texas Administrative Code (TAC) Chapter 309 are adopted under the Texas Water Code (TWC). Specifically, TWC, §5.013, which establishes the general jurisdiction of the commission while TWC, §5.102, provides the commission with the authority to carry out its duties and general powers under its jurisdictional authority as provided by TWC, §5.103; TWC, §5.103, which requires the commission to adopt any rule necessary to carry out its powers and duties under the code and other laws of the state; TWC, §5.105, which authorizes the commission to adopt rules and policies necessary to carry out its responsibilities and duties under the TWC; and TWC, §5.120, which requires the commission to administer the law for the maximum conservation and protection of the environment and natural resources of the state. These amendments are also adopted under TWC, §26.027, which authorizes the commission to issue permits for the discharge of waste or pollutants into or adjacent to water in the state; TWC, §26.121, which provides the commission's authority to prohibit unauthorized discharges into or adjacent to water in the state; and TWC, §26.131, which provides the commission's authority to issue permits for the discharge of produced water into water in the state and for the land application of produced water.

The adopted amendments implement TWC, §§5.013, 5.102, 5.103, 5.105, 5.120, 26.027, 26.121, and 26.131.

§309.20. Land Application of Treated Effluent.

(a) Technical report. Each project shall be accompanied by a preliminary engineering report outlining the design of the wastewater application system. The report shall include maps, diagrams, basis of design, calculations, and other pertinent data as described in this section.

(1) Location.

(A) Site map. A copy of the United States Geological Survey 7 1/2 minute topographic map or equivalent for renewals of the area which indicates the exact boundaries of the application operation must be included in the technical report. A map from the 7 1/2 minute series is required if it is published for the site area.

(B) Site drawing. A scale drawing and legal description of all land which is to be a part of the application operation will be included in the technical report. The drawing must show the location of all existing and proposed facilities to include: buildings, wastewater application or treatment facilities, effluent storage and tail water control facilities, buffer zones, and water wells. This drawing must have an index of wells, adjacent property, and other prominent features. Ownership of land tracts adjacent to the irrigated land shall be shown on the site drawing and identified by listing legal ownership.

(2) Geology. The existence of any unusual geological formations such as faults or sink holes on the wastewater application site shall be noted in the technical report and identified on the site map. The conceptual design of the wastewater application system shall include appropriate engineering considerations with respect to limitations presented by these features.

(3) Soils. A general survey of soils with regard to standard classifications shall be compiled for all areas of wastewater application to the soil. Soil surveys compiled by the United States Department of Agriculture Natural Resources Conservation Service shall be utilized where available. Conceptual design aspects related to wastewater application rates, crop systems, seepage, and runoff controls shall be based upon the soil physical and chemical properties, hydraulic characteristics, and crop use suitabilities for the wastewater application site.

(4) Groundwater quality. The technical report shall fully assess the impact of the wastewater application operation on the uses of local groundwater resources. In regard to performing this assessment, the report shall systematically address subparagraphs (A) and (B) of this paragraph.

(A) All water wells within a 1/2 mile radius of the application site boundaries shall be located. If available, the water uses from each well shall be identified. In addition, aspects of construction such as well logs, casing, yield, static elevation, water quality, and age shall be furnished and evaluated in the technical report. Local groundwater resources below the wastewater application site shall be monitored to establish preoperational baseline groundwater quality when monitoring wells are available. Monitoring shall provide the following analytical determination: total dissolved solids, nitrate nitrogen, chlorides, sulfates, pH, and Escherichia coli bacteria.

(B) Groundwater resources serving as sources or potential sources of domestic raw water supply will be protected by limiting wastewater application rates. Effluent storage and/or treatment ponds presenting seepage hazards to these groundwater resources shall be constructed with adequate liners.

(5) Agricultural practice. The technical report shall describe the crop system proposed for the wastewater application operation. This description shall include a discussion of the adaptability of the crop to the particular soil, climatological, and wastewater sensitivity conditions that will exist at the wastewater application site. Annual nutrient uptake of the crop system shall be specified, and crop harvesting frequencies shall be described within the report.

(b) Irrigation. Irrigation application systems utilize effluent to supply the growth needs of the cover crop.

(1) Secondary effluent. Land application system operators who use land accessible to the general public shall provide a degree of treatment equivalent to secondary treatment standards, as required by §309.3(f)(1) of this title (relating to Application of Effluent Sets), prior to application of wastewater to land areas.

(2) Primary effluent. Land application systems may provide for the application of effluent from primary treatment units provided that the wastewater application system conforms with the requirements contained in subparagraphs (A) - (E) of this paragraph.

(A) The wastewater application system shall be designed and operated to prevent a discharge from entering surface water in the state, and to prevent recharge of groundwater resources which supply or offer the potential of supplying domestic raw water.

(B) The land application system shall be designed and operated to achieve application of effluent without adversely affecting the agricultural productivity of the land application site.

(C) The economic benefits derived from agricultural operations carried out at the land application site are secondary to the proper application of wastewater.

(D) The sewerage system owner shall maintain direct responsibility and control over all aspects of the sewage pretreatment and application operations, as well as all aspects of any agricultural activities carried out on the application site.

(E) The land application system shall contain sufficient area to provide for normal expansion of the facility service area. In most cases, the application system shall have a design life of at least 20 years.

(3) Design analysis. The designing engineers shall utilize a detailed design analysis of limiting hydraulic and nutrient application rates, and effluent storage needs, as the basis of the application system design. All projects shall include the detailed design analysis described in subparagraphs (A) - (C) of this paragraph.

(A) Hydraulic application rate. A water balance study shall be provided as a part of a detailed application rate analysis in order to determine the irrigation water requirement, including a leaching requirement if needed, for the crop system on the wastewater application areas. The water balance study should generally follow the example shown in Table 1 in Figure: 30 TAC §309.20(b)(3)(B). Precipitation inputs to the water balance shall utilize the average yearly rainfall and the monthly precipitation distribution based on past rainfall records. The consumptive use requirements (evapotranspiration losses) of the crop system shall be developed on a monthly basis. The method of determining the consumptive use requirement shall be documented as a part of the water balance study. A leaching requirement, calculated as shown in Table 1 of this subparagraph, shall be included in the water balance study when the total dissolved solids concentration of the effluent presents the potential for developing excessive soil salinity buildup due to the long term operation of the irrigation system.

(B) Effluent storage. An effluent storage study shall be performed to determine the necessary storage requirements. The storage requirements shall be based on a design rainfall year with a return frequency of at least 25 years (the expected 25 year-one year rainfall, alternately the highest annual rainfall during the last 25 years of record may be used) and a normal monthly distribution, the application rate and cycle, the effluent available on a monthly basis, and evaporation losses. An example of an effluent storage study is shown in Table 3 in Figure: 30 TAC §309.20(b)(3)(B).

Figure: 30 TAC §309.20(b)(3)(B) (No change.)

(C) Nitrogen application rate. Irrigation shall be limited to prevent excessive nitrogen application. The annual liquid loading shall not exceed that which would introduce more nitrogen than is annually required by the crop plus 20% volatilization. Values of crop nitrogen requirements shall be justified in the design report. The application rate shall be calculated by the formula in Figure: 30 TAC §309.20(b)(3)(C).

Figure: 30 TAC §309.20(b)(3)(C) (.pdf)

(4) Soil testing. Representative soil samples shall be taken from the root zones of wastewater application sites to establish preoperational soil concentrations of pH, total nitrogen, potassium, phosphorus, and conductivity. Sampling procedures shall employ accepted techniques of soil science for obtaining representative analytical results. Preoperational soil concentration of the parameters listed in this paragraph shall be furnished in the technical report. The project development shall provide for a minimum of one soil test annually from each wastewater application site for the duration of the application system design life.

(5) Standard irrigation best management practices.

(A) Screening devices should be installed on all lift pump suction intakes.

(B) The design of sprinkler irrigation systems should allow operational flexibility and efficiency and ease of maintenance.

(i) The system should be designed to provide a uniform water distribution.

(ii) The designing engineer should consider such items as permanently buried mains with readily accessible valve boxes, two or more lateral lines, and quick coupling valves at the main/lateral connections.

(iii) Cross connection with a potable water supply system is prohibited. Cross connection with a well water system will be reviewed on a case-by-case basis.

(C) Vehicular access to conveyance system locations and equipment should be provided at intervals of 1,000 feet to 1,300 feet.

(D) The cover crop of each wastewater application area shall be harvested a minimum of once per year. Consideration should be given to the selection of crops which will allow two or more harvests per year to be made.

(E) All effluent applied as irrigation water should have a pH within the range of 6.0 to 9.0.

(c) Percolation. Percolation application systems provide for ultimate application of the wastewater by evaporation and percolation with no resulting discharge to surface water in the state.

(1) Percolation systems will not be permitted in those locations where seepage would adversely affect the uses of groundwater resources.

(2) Primary treatment of the raw sewage shall be provided prior to land application.

(3) Percolation systems shall be limited to sites having soil textures suitable for sustaining a rapid intake rate. Percolation dosing sites shall be limited to soils classified as sands, loamy sands, or sandy loams having a minimum infiltration rate of six inches per hour.

(4) Multiple dosing basins shall be provided for the application of wastewater. The wastewater distribution system shall be designed to provide a maximum dosing period of 24 hours upon any individual dosing basin and a minimum resting period for any individual dosing basin of five days following a period of dosing.

(5) The hydraulic loading rate will be considered on a case-by-case basis. The designing engineer shall identify the permeability of the limiting soil layer.

(6) The design shall provide an area equal to a minimum of 20% of the total application site area for the construction of wastewater storage for use during periods of wet or freezing weather and to provide flexibility of dosing site use.

(d) Additional Requirements. Additional site-specific requirements for the treatment and disposal of industrial wastewater, including disposal of produced water under Tex. Water Code §26.131(e) that is treated for beneficial use, may be established on a case-by-case basis.

The agency certifies that legal counsel has reviewed the adoption and found it to be a valid exercise of the agency's legal authority.

Filed with the Office of the Secretary of State on November 6, 2026.

TRD-202604702

Amy L. Browning

Deputy Director, Environmental Law Division

Texas Commission on Environmental Quality

Effective date: November 26, 2026